My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
02/12/1996 BOARD OF SELECTMEN Minutes
>
02/12/1996 BOARD OF SELECTMEN Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/31/2019 5:03:18 PM
Creation date
1/31/2019 12:24:24 PM
Metadata
Fields
Template:
Mashpee_Meeting Documents
Board
BOARD OF SELECTMEN
Meeting Document Type
Minutes
Meeting Date
02/12/1996
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
45
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
riy <br /> is <br /> 11. 8/31/95-Stone notifies Building Committee <br /> that project is on schedule, states GPM steel <br /> y~YFr date was in error. <br /> Y.w <br /> 12. 9/1/95 <br /> Kopelman and Paige (KBcP) notifies 9/$/95-Sone responds to K&P with co of <br /> Py <br /> xv, <br /> ` b Stone of Town's concern over project delay, 2 8/31/95 Stone letter. <br /> successive months of less than 90 <br /> %work <br /> completed, and outdoor field substantial <br /> ` completion. <br /> 13. 9/6/95-Const Meeting 8--project is 3 weeks <br /> behind the 7/21/95 GPM Schedule. <br /> 14. 9/$/95-SMMA notifies Stone of Building 9/15/95-Stone responds to Building......... <br /> ;.,,... Committee request for Special Construction Committee with plan for completing Steel Shop <br /> meeting with Stone and Subs to review Drawings and construction, but with no dates. <br /> schedule. At Special Meeting 2,Stone states <br /> that entire building will be weathered in and <br /> heated for winter construction. <br /> 15. 9/14/95-SMMA responds to Stone 8/31/95 No response from Stone. <br /> letter as 1)Stone to submit revised CPM with <br /> corrected steel commencement date, 2)notify <br /> that shop drawings are behind dates stated, 3) <br /> outdoor field are not substantially complete. <br /> 16. 9/16/95-SMMA requests dates for steel shop9/19/95-Stone responds to SMMA and <br /> submissions. provides dates, entire stegal cmatruction to he <br /> completed on 1,1/15/9.5. <br /> 17. 9/26/95-Stone submits revised 9/20/95 CPM <br /> Schedule. <br /> 18. 9/27/95--SMMA notifies Stone pricing for No response from Stone. <br /> PR4 and 5 is overdue since 9/1/95. <br /> 19. 10/2/95-SMMA notifies Stone that the <br /> revised 9/20/95 CPM Schedule is not accepted <br /> re.finish trades. <br /> 20. 10/2/95-SMMA.notifies Stone of third No response from Stone. <br /> successive month of less than 90%work <br /> completed. <br /> 21. 10/4/95-Substantial Completion of outdoor <br /> fields. 28 days after contract date) <br /> 22. 10/4/95 W SMMA notifies Stone of Building 11/6/95-Stone responds to SMMA that steel <br /> Committee direction to increase manpower, sub will increase crew size and days per week <br /> shifts etc. worked. <br /> r 23. 10/11/95-Const Meeting- 10-project is 4 <br /> weeks behind the 7/21/95 CPM Schedule <br /> 24. 10/25/95-Stone submits revised 10/23/95 <br /> CPM Schedule. <br /> 25. 10/25/95-Const Meeting 11--project is 6 <br /> weeks behind the 7/21/95 CPM Schedule <br /> 26. 11/1/95-SMMA notifies Stone of fourth No response from Stone. <br /> ■ <br /> 5vmmes Maini&McKee Associates P.-Inn*2 F <br />
The URL can be used to link to this page
Your browser does not support the video tag.