My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
02/12/1996 BOARD OF SELECTMEN Minutes
>
02/12/1996 BOARD OF SELECTMEN Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/31/2019 5:03:18 PM
Creation date
1/31/2019 12:24:24 PM
Metadata
Fields
Template:
Mashpee_Meeting Documents
Board
BOARD OF SELECTMEN
Meeting Document Type
Minutes
Meeting Date
02/12/1996
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
45
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
A R C H I T E C T U R E E N G IN E E R ING STRATEGIC PLANNING RESOURCES <br /> SMMA <br /> Febru 12 1996 5ymmes Maini&McKee Associates - <br /> CAME RID . OF <br /> G E.M A MINNEAPOLIS.MN �� � v <br /> Mr.Paul Griffin <br /> Chairman Fax to: <br /> Mash h School B Griffin(617)863-5245 <br /> pee High wilding Committee Paul Gri <br /> c/o McGraw Hill Tom Wren (508)477-4184 <br /> 24 Hartwell Avenue LPal Costello(61 7)654-1735 <br /> Lexington, MA 92173 <br /> Re: Mashpee High School <br /> Contractor Performance SMMA No. 94923 <br /> Dear Paul: <br /> As requested we have summarized below the events of the project relating to schedule,non-complying <br /> work and shop drawings/coordination drawings. Our findings are as follows: <br /> A. SCHEDULE <br /> ri <br /> 1. 5/8/95-Town issues Notice to Proceed to <br /> Stone <br /> 2. 5/31/95-SMMA notifies Stone project 2 No response from Stone <br /> weeks behind 60 day schedule <br /> 3. 6/29/95-SMMA notifies Stone project over 2 9/27/95--Stone provided plan to Building <br /> P g <br /> weeks behind and request Stone to provide Committee for increased footing placement to <br /> _ g <br /> remediation plan at 6/27/95 Building make up delay. <br /> Committee meeting. <br /> 4. 7/5/95-Const Meeting 4-project is over 2 <br /> weeks behind 60 day schedule <br /> 5. 7/17/95-SMMA notifies Stone project over 3 No response from Stone. <br /> weeks behind schedule and increased footing <br /> production never occurred. <br /> 6• 7/21/95-Stone submits 7/21/95 GPM <br /> Schedule. <br /> 7. 7/19/95-Const Meeting 5-delayed progress <br /> of outdoor fields reviewed,Stone stated will be <br /> complete by 9/6/95 as per contract. <br /> T 1Y 8. 7/26/95-SMMA notifies Stone of Building 8/7/95-Stone responds to SMMA with delay <br /> Committee direction for submission of plan for remediation plan,but date stated as structural <br /> <<s increased manpower,shifts etc., to remediate steel commencement is 2 weeks after date on <br /> delay. accepted CPM Schedule <br /> 9. 8/8/95-SMMA notifies Stone that the <br /> >1 <br /> :. 7/21/95 CPM Schedule accepted <br /> .: 10. 8/8/95-SMMA notifies Stone of acceptance No response from Stone. <br /> of plan and requests correction of steel <br /> commencement date to coincide with GPM <br /> Schedule. <br /> ■ <br /> Massachusetts 02138 Tel 617.547.5400 Fax 354.5758 <br />
The URL can be used to link to this page
Your browser does not support the video tag.