My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
5/23/1996 BOARD OF SELECTMEN Minutes
>
5/23/1996 BOARD OF SELECTMEN Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/31/2019 5:10:18 PM
Creation date
1/31/2019 3:35:59 PM
Metadata
Fields
Template:
Mashpee_Meeting Documents
Board
BOARD OF SELECTMEN
Meeting Document Type
Minutes
Meeting Date
05/23/1996
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
22
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
OWNER <br /> x <br /> Change <br /> Order <br /> .� <br /> • ARCHITECT x <br /> AIA <br /> Document G701 - Electron Format <br /> CONTRACTOR <br /> FIELD [� <br /> OTHER [ ] <br /> CHANGE ORDER NUMBER: 414 <br /> PROJECT: <br /> (name,address) <br /> Dash ee Hicrh School DATE: April 26, 199 <br /> Mashnee,MA <br /> TO CONTRACTOR: <br /> ARCHITECTS PROJECT NO: 94023 <br /> (name,address) <br /> The Stone Building Cam an CONTRACT DATE: May 8 1995 <br /> 180 Allens Avenue <br /> CONTRACT FOR: General Construction <br /> Providence, RI 02905 <br /> The Contract is changed as follows: - <br /> 1.Add 3 tennis courtsper Change a Estimate 006.4 dated 1111196. <br /> 2.Add 1 basketball courtper Change Estimate 006.5 dated 4124196. <br /> e accessories er Change Estimate 006 <br /> 3.Add site .7 dated 01111196. ted 2127196. <br /> 4,Add sidewalks south of G mnasum, per Chana a Estimate 006.8 da <br /> 5.Addsynthetic track surfacing <br /> to outdoor track, per Change Estimate 0111 dated 11109195. <br /> 6,Addlantin� materials er Change Estimate 012.4 dated 11149195. <br /> :ii <br /> Not valid until signed by <br /> the Owner, Architect and contractor. <br /> � 1 <br /> i <br /> $1 V <br /> The original(Contract Sum) <br /> A[.,1Xjn1U1n__Pr;rjL3'A was <br /> 094 44x.40 <br /> Net change by previously authorized Change Orders <br /> $374 237.00 <br /> The(Contract Sum}f G-wart .00 <br /> prior <br /> p for to this Change Order was . <br /> NIS LEGAL CONSEQUENCES; CONSULTATION WITH AN ATTORNEY IS <br /> S DOCUNIENT HAS IMPORTANT <br /> EN COMPLETION OR MODIFICATION. AUTHENTICATION OF THIS <br /> ENCOURAGED WITH RESPECT TO ITS <br /> ELECTRONICALLY DRAFTED AIA DOCUMENT MAY BE MADE BY USING AIA DOCUMENT D401. <br /> AIA D _COPYRIGHT 1987-THE AMERICAN INSTITUTE of ARCHITECTS, 1735 NEW YORK AVENUE. <br /> under <br /> OCU1,iENT G701 -CHANGE ORDER- i 9s7 EDITION AIA CD <br /> wA$HINGTON,D.C.,20006-5292.WARNING:Unlicensed photocopying violates U.S.copyright laws and is subject m legal prosecution.This document was electronically pr <br /> liven:e number 796001 239 and can be reproduced without violation until 7/27!96. Service G701-1987 <br /> Electronic Document <br />
The URL can be used to link to this page
Your browser does not support the video tag.