My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
7/8/1996 BOARD OF SELECTMEN Minutes
>
7/8/1996 BOARD OF SELECTMEN Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/31/2019 5:13:37 PM
Creation date
1/31/2019 3:42:36 PM
Metadata
Fields
Template:
Mashpee_Meeting Documents
Board
BOARD OF SELECTMEN
Meeting Document Type
Minutes
Meeting Date
07/08/1996
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
25
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Change Order <br /> OWNER [x] <br /> AIA Document G701 - Electronic Format ARCHITECT x <br /> CONTRACTOR [x] <br /> FIELD [X] <br /> OTHER [ ] <br /> PROJECT: CHANGE ORDER NUMBER: o 19 <br /> (name,address) <br /> MashpeeHigh School <br /> Mashpee,MA DATE: July 1, 1996 <br /> TO CONTRACTOR: + <br /> (name,address) ARCHITECT'S PROJECT NO: 94023 <br /> The Stone Building.Company . <br /> 784 Allens Avenue CONTRACT DATE. May-8, 1995 <br /> Providence,RI 42905 CONTRACT FOR: General Construction <br /> The Contract is changed as follows: <br /> 1,Provide.plumbing pipingfor Cafeteria canopy roof drainsper Change Estimate 11 dated 6/7196. <br /> 21ocate exhaust ductwork over classroom.A-130 from corridor, per Change_ Estimate 30, dated 1/3/96.*.,, <br /> 3,Provide additional traff c si nsper Change Estimate 75 dated 512/96. / } <br /> 4,Provide additional plumb*ng pipingto Science Laboratory casework <br /> _per Change Estimate 87 dated 617196. !. <br /> S,Provide filter fabric at leaching field of WWTP per health Department re uest per Change Estimate 82 dated <br /> 6113/96. <br /> 6,Provide floor drain in Nutrition Room B--126 for dishwasher wasteer Change Estimate 94 dated 6112196. <br /> Not valid until signed by the Owner, Architect and Contractor. <br /> The original (Contract Surn) was $189,0903000.00 <br /> Net change by previously authorized Change Orders $814209.00 <br /> The(Contract Surn)(C-Iii2r2ritead XA2ximum Pri <br /> Prior to this Change Order was $18,904,209.00 <br /> i <br /> THIS DOCUMENT HAS IMPORTANT LEGAL CONSEQUENCES; CONSULTATION WITH AN ATTORNEY IS <br /> ENCOURAGED WITH RESPECT TO ITS COMPLETION OR MODIFICATION. AUTHENTICATION OF THIS <br /> ELECTRONICALLY DRAFTED AIA DOCUMENT MAY BE MADE BY USING AIA DOCUMENT D401. <br /> AIA DOCUMENT G701-CHANGE ORDER-1987 EDITION-AIA-COPYRIGHT 1987-THE AMERICAN INSTITUTE OF ARCHITECTS, 1735 NEW YORK AVENUE,N.W., <br /> WAS NT <br /> D.C.,20006-5292.WARNING:Unlicensed photocopying violates U.S.copyright laws and is subject to legal prosecution.This document was electronically produced under <br /> "'lase number 796001239 and can be reproduced without violation until 7/27195. <br /> Electronic Document Service G701-1987 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.