Laserfiche WebLink
44 Steeple street continued <br /> Dole lights shining down will be used; the transformer behind Emerald <br /> would power the lighting. <br /> Discussion <br /> Jonathan Furbush said that there was not much provided for the committee to <br /> review—no handouts were provided. Mike Mendoza commented that while the <br /> Site Plan is helpful, Design Review s responsibility is to review design; colors; <br /> etc. that are proposed. <br /> CONCLUSION <br /> Motion: Joseph Cummings motioned to continue the temporary 18-hole <br /> application until the next meeting of Design Review. Jonathan Furbush <br /> seconded the motion; and the motion was passed by Design Review. <br /> 45 Steeple street <br /> Mashpee Commons Limited Partnership <br /> Requests the installation of a performance stage. <br /> Representative –Thomas Feronti <br /> John Connell presented the Site Plan, an architect proposed structure plan, as <br /> well as a cut-out sample of a removable stage structure to b located at the corner <br /> of Oak and Steeple Street. <br /> There is power to this site. <br /> Stage can be disassembled. <br /> 0 Stage will be mounted. <br /> o John Rent said the structure will be 28'.6"X15'-11". <br /> 0 site is 2.14 acres. <br /> 0 Color will be black membrane, which facilitates shoring of movies. <br /> * Mashpee Commons will remove just a few trees and will improve the lawn <br /> there. <br /> o Jonathan Furbush asked about sound/lighting. John Connell said <br /> performers will bring their own equipment and when done everything will <br /> be removed. <br /> 0 John Connell said performances will be same hours as traditionally done <br /> at Mashpee Commons. John lent added the comment that it is usually <br /> before dark and ends around 8-9 p.m. on weekends and evenings. <br /> 3 <br />