My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
8/1/2017 DESIGN REVIEW COMMITTEE Minutes
>
8/1/2017 DESIGN REVIEW COMMITTEE Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/1/2019 5:37:11 PM
Creation date
2/1/2019 3:02:31 PM
Metadata
Fields
Template:
Mashpee_Meeting Documents
Board
DESIGN REVIEW COMMITTEE
Meeting Document Type
Minutes
Meeting Date
08/01/2017
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Minutes of Meeting of <br /> Mashpee Design Review Committee <br /> Tuesday, August 1, 2017 <br /> Mash pee Town Hall Waquoit Meeting ng Room <br /> Committee Members Present: Jonathan Furbush, Joseph Cummings, Joshua <br /> Spencer, and Michael Mendoza. <br /> Michael Mendoza called the meeting to order at 8:34 a.m. <br /> 736 Falmouth Road <br /> Business name: Longfellow Design Build <br /> Owner: Mark Bogosian <br /> Requests a new building – 5,760 square feet (footprint)} 7,450 <br /> Square feet (gross floor area) for a commercial building <br /> Consisting of offices and contractor bays. <br /> Mark Bogosian (owner) and Matt Costa (Cape & Islands Engineering) appeared. <br /> Hiatt Costa said Applicant is proposing a commercial project at the site on 28 <br /> located right next to the gas station. Klatt showed an aerial overhead imagery <br /> overlay to show the location. Matt presented highlights of the proposal: <br /> Property already has a curb cut on 28. <br /> Proposing a single building—Kind of split level with two-story look at front; <br /> garage doors are at back with only one story. <br /> 0 Matt said Mike Mendoza brought his attention to the inconsistency <br /> between the building coverage and the zoning coverage table, but the <br /> total lot coverage is 9.8%, which was noted in the rotes. <br /> 0 Setback is 150' oft 8; 100' buffer off of 28, <br /> 0 All drainage and swales connected on-site. Will do open drainage swales <br /> at front. <br /> 0 Colors as shown -white with darker grey; going with the cape Cod look. <br /> Mark Bogosian said they will use steamed grey shales. <br /> 0 Rather than having all parking in back, it males more sense to put some <br /> of the parking in the front, but they are screening the front parking area. <br /> [Katt said it would be similar to building down the street. <br /> Discussion <br /> Jonathan F urbush said he would like to see the front dressed up a bit. Joshua <br /> Spencer suggested adding a fever ornamental trees and maybe some small <br /> flowering evergreens. Marl Bogosian said he is totally on board with that. <br /> Jonathan questioned the look of the windows and doors. Mark Bogosian said <br /> they are trying to add small detail to the building so placed overhang over the <br /> windows. <br />
The URL can be used to link to this page
Your browser does not support the video tag.