My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1/26/2017 MASHPEE-WAKEBY LAKE MANAGEMENT COMMITTEE Minutes
>
1/26/2017 MASHPEE-WAKEBY LAKE MANAGEMENT COMMITTEE Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/11/2019 5:04:49 PM
Creation date
2/11/2019 1:49:44 PM
Metadata
Fields
Template:
Mashpee_Meeting Documents
Board
MASHPEE-WAKEBY LAKE MANAGEMENT COMMITTEE
Meeting Document Type
Minutes
Meeting Date
01/26/2017
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
[Agenda topic 3] Darn Inspections <br /> Discussion: Andrew Gottlieb sent Barbara a copy of the certified letter sent to the Torn From DCR in <br /> Dec. requiring an inspection of the Town Dans before April 1"by a Comm. Of IIA professional <br /> Engineer. The dam at the fish way was deieftled' <br /> 1h Pair 06nditioh wh6h last inSpe ted ill 2 Od 9 and the At. <br /> t 3 0 dam was also judged as fair in its last ifispeetlOn in Tune 2011, C o�ies of these iispeetloiis were <br /> feviewed. Barbara received them at the January 5th meeting with Dtew in ons t` ation. <br /> Conclusions; Two Mashpee urns on the river outlet from the lake are due for inspection before April. <br /> [Agenda topic 41 Committee vacancy <br /> Discussion: The committee is still lacking a "' member. We need publicity to help find someone willing <br /> to serve. <br /> Conclusions: We need a fifth member for this committee. <br /> [Agenda topic 5] <br /> Discussion: <br /> conclusions: <br /> The meeting was adjourned at 7:58 P.M. <br /> Respectfully submitted, <br /> Barbara B.Nichols <br />
The URL can be used to link to this page
Your browser does not support the video tag.