My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
4/27/2017 MASHPEE-WAKEBY LAKE MANAGEMENT COMMITTEE Minutes
>
4/27/2017 MASHPEE-WAKEBY LAKE MANAGEMENT COMMITTEE Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/11/2019 5:13:41 PM
Creation date
2/11/2019 1:50:51 PM
Metadata
Fields
Template:
Mashpee_Meeting Documents
Board
MASHPEE-WAKEBY LAKE MANAGEMENT COMMITTEE
Meeting Document Type
Minutes
Meeting Date
04/27/2017
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Ma Waked Lake Management <br /> Co' mmiUtee <br /> April 27,2017 <br /> "x:30 PM <br /> Mashpee Town Hall <br /> Meeting called by: Debi McManus <br /> Type of meeting: Monthly <br /> Secretary Barbara B.' Nichols <br /> Attendees: Members: Ikon MacDonald, Barbara Nichols <br /> Guests: <br /> The Minutes of the March 23,, 2017 meeting were accepted as written after a motion by Don MacDonald <br /> and second by Barbara Nichols <br /> AgendaloplIcs <br /> MR P MOOM <br /> [Agenda topic 1] Labe level/River outflow <br /> Discussion: Barbara did the lake measurements on April 2"d and Brian on the 15t". They were 55.5 and <br /> 5.4 ft. above sea level with 1 '/4 and 13 inches of water flowing over the board closest to the lake and <br /> 11 3 4 and 11 inches of water in the strew by the stairs. Measurements were seat to Drew McManus in <br /> Conservation. Drew emailed that he had a successful clean- up of the Maslhpee river from Rt, 28 to the <br /> outlet cage two weeks ago and had removed 8 twenty gallon trash bags and 4 tires from the river, <br /> . olieb, exectman emailed that mill be repairing potholes at the State beat ramp parkin lot <br /> and will be reimbursed by the State. The signage at the ramp is still in progress. It will be done by DPW <br /> and has been approved by the state <br /> Conclusions: The lake level is remaining stable with the spring rain. Potholes in the park-Ing lot will be <br /> Y <br /> repaired, <br /> [Agenda topic ] Fall Newsletter <br /> sletter <br /> Dise,ussion: Debi is working on an article on boating regulations. We will repeat Don's article on <br /> mooring regulations. It is hope to have a six page newsletter complete by the end of May. <br /> Conclusions; We hope to have the spring newsletter completed by the end of May. <br />
The URL can be used to link to this page
Your browser does not support the video tag.