My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
11/13/1996 BOARD OF SELECTMEN Executive Session (4)
>
11/13/1996 BOARD OF SELECTMEN Executive Session (4)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/21/2019 4:03:51 PM
Creation date
2/21/2019 4:00:32 PM
Metadata
Fields
Template:
Mashpee_Meeting Documents
Board
BOARD OF SELECTMEN
Meeting Document Type
Executive Session
Meeting Date
11/13/1996
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
72
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
s <br /> Change <br /> Order OWNER x <br /> AIA Document G701 - Electronic Format ARCHITECT [x] <br /> CONTRACTOR [ ] <br /> FIELD [x] <br /> OTHER t ] <br /> PROJE <br /> CT: CHANGE ORDER NUMBER: 025 <br /> (name,address) _ <br /> Mash�ee High School, ATE: October 16 1 <br /> D 996 <br /> - - <br /> J <br /> TO CONTRACTOR. ARCHITECT'S PROJECT NO: 94023 <br /> (name,address) CONTRACT DATE: may 8 1995 <br /> The Stone Building Com an <br /> 784 Allens Avenue CONTRACT FOR: General Construction <br /> Providence RI 02905 <br /> The Contract is changed as follows: <br /> I.Increase iri ation main line to 4" er Chan a Estimate 12.3a dated 9120/96. <br /> ? e cote hose valve cabinet i in in G mnasium and Auditorium Per Change Estimate 125 dated 8127196. <br /> F R to <br /> 3.Provide batter return feature for the elevator er Chan e Estimate 126 dated 9120196. <br /> 4,Provide Ira rimers foropen en end drains in Rooms A-228 B 122 and C-147per Change Estimate 130 dated <br /> 1/]18196. <br /> 5.Provide additional li ht fixture and rece tacle for the elevator er Change Estimate 135 dated 9120196. <br /> 6.Provide additional interior directional si ns er Change Estimate 136 dated 9120196. <br /> 7.Relocate the radiant heat panel in Room D 116 er Chan a Estimate 137 dated 9120196. <br /> 8.Provide power to the ciculatin um a uastats er Chan e Estimate 148 dated 1019196. <br /> 9.Provide power to the dishwasher er Chan e Estimate 149 dated 1018/96. <br /> 10.Provide ower to exhaust fan no. 38per Chan a Estimate 151 dated 1018196. <br /> I].Provide control wiringfor the Auditorium fire curtain er Chan e Estimate 152dated 1018196. <br /> Not valid until signed h the owner, Architect and Contractor. <br /> 9 Y <br /> $18 090 000.00 <br /> The original (Contract Sum)(C-uar-anteed_Ma-xi-m-uwas <br /> THIS DOCUMENT HAS IMPORTANT LEGA CONSEQUENCES;UENCES; CONSULTATION WITH AN ATTORNEY IS <br /> � <br /> ENCOURAGED WITH RESPECT TO ITS COMPLETION OR MODIFICATION. AUTHENTICATION OF THIS <br /> ELECTRONICALLY DRAFTED AIA DOCUMENT MAY BE MADE BY USING AIA DOCUMENT D401. <br /> AIA DOCUNIENT G701 -CHANGE ORDER- I987 EDITION-AIA-COPYRIGHT 19S7-THE AMERICAN INSTITUTE OF ARCHITECTS, 1735 NEW YORK AVENUE,N.W.. <br /> ��►1S111NGTON,D.C.,'20006-5292,WARNING.Unlicensed photocopying violates U.S.copyright laws and is subject to legal prvsecution.This document was electronically produced under <br /> N'Rse number 797001239 and can be reproduced without violation until 7131197. Electronic Document Service G701-1987 1 <br /> i <br /> y <br /> t <br />
The URL can be used to link to this page
Your browser does not support the video tag.