Laserfiche WebLink
hange Order OWNER <br /> A Document G701 - Electronic Format ARCHITECT � <br /> CONTRACTOR [x� <br /> } <br /> FIELD <br /> OTHER [ ] <br /> E <br /> EJECTCHANGE ORDER NUMBER: 026 <br /> . <br /> me,address) <br /> 'ash ee Hi h School DATE: October 28 1996 <br /> 'ash ee MA <br /> O <br /> CONTRACTOR: 4023 <br /> ARCHITECTS PROTECT NO 9 <br /> ame, address) <br /> e Stone Building Company CONTRACT DATE: Mai S, 1995 <br /> 4 Aliens Avenue <br /> CONTRACT FOR: General Construction <br /> ovidence RI 02905 <br /> :the Contract is changed as follows: <br /> tisk:Add wail hydrantser Change Estimate 601_ dated 10116196. <br /> Add as connections to roafto units er Chan e Estimate 77 dated 10116196. <br /> 5•�.a <br /> i , <br /> +moi' <br /> F� <br /> at valid� until signed �y the owner, Architect and Contractor. <br /> }k�V <br /> $1820902000.00 <br /> :The original (Contract Sum)� was <br /> arantee y <br /> ti $949 650.00 <br /> Net change by previously authorized Change orders <br /> s <br /> he Contract Sum $19,9039 560.00 <br /> r{prior to this Change order was <br /> :r. <br /> =The(Contract um will be . <br /> Sum) <br /> • b this Change order in the amount of <br /> gin.(increased}(,d y <br /> e• <br /> ATION WITH AN ATTORNEY IS <br /> T THIS DOCUMENT HAS IMPORTANT LEGAL CONSEQUENCES; CONSULT AUTHENTICATION OF THIS <br /> ENCOURAGED WITH RESPECT TO ITS COMPLETION OR MODIFICATION. <br /> E MADE BY USING AIA DOCUMENT D40 I. <br /> ELECTRONICALLY DRAFTED AIA DOCUMENT MAY B <br /> y1ERICAN IN OF ARCHITECTS.1735 NEW YORK AVENUE,N.W.. <br /> AIA 0 _ ORDER-I987 EDITION-AIA.CopyRIGHT 1987-THE and is subject to legal prosecution.This document was electronically produced under <br /> DOCUMENT G741 CHANGE violates U.S.co yrt ht laws <br /> WASHINGTON,D.C.,24006-5292.WARNING:Unlicensed photocopying p g <br /> license number 797001239 and can be reproduced without violation until 7131197. Electronic Document Service G701-1987 1 <br />