My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
03/11/2019 BOARD OF SELECTMEN Agenda Packet
TownOfMashpee
>
Town Clerk
>
Minutes
>
SELECT BOARD
>
AGENDA PACKETS
>
2010-2019
>
2019
>
03/11/2019 BOARD OF SELECTMEN Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/22/2019 5:01:15 PM
Creation date
3/22/2019 12:41:18 PM
Metadata
Fields
Template:
Mashpee_Meeting Documents
Board
BOARD OF SELECTMEN
Meeting Document Type
Agenda Packet
Meeting Date
03/11/2019
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
94
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Ilown of Mashpee Department of Pubfic Works <br /> : <br /> 350 Meetinghouse load <br /> 9�ry <br /> Mashpee, Massachusetts 02649 <br /> Telephone - (508)539-1420 <br /> FaX- (508)539-3894 <br /> MEMORANDUM <br /> March 5, 2019 <br /> TO: Board of Selectmen <br /> Rodney Collins, Town Manager <br /> FROM: Catherine Laurent, Director <br /> RE: Recommendation for Approval of Change Order No. 7 <br /> Quashnet School Windows/Roof Project <br /> Description <br /> With completion of the Quashnet School Windows/Roof project,there are several punch list <br /> items the Town is accepting in their current condition without further work. The contractor has <br /> agreed to a net credit of$5,013.23 as a result. <br /> Background <br /> Spot Mortar Repair The color of a batch of mortar used for brick repairs on the gym roof is <br /> similar in color not an exact match to the mortar used elsewhere. Rather than have the mortar <br /> removed and replaced, as the difference will not be visible from the ground, the Town will <br /> accept the existing condition with a credit of$1,008.62. <br /> Window Sill Corian Seams The seams at five window ledge locations in classrooms and <br /> hallways are not perfect (seam is visible if location is pointed out). Rather than have the seams <br /> redone with no guarantee of an improved condition,the Town will accept the existing condition <br /> with a credit of$250 per window or$1,250 total. <br /> Superintendent's Office Foyer Condition The wall finish above the interior door has "wrinkles" <br /> from the replacement of the door and adjacent window. The general contractor tried to <br /> correct but was unsuccessful in completely eliminating the wrinkle. The Town will accept the <br /> existing condition with the credit of$250. DPW will address ourselves at a later date. <br /> Finish Landscaping Most disturbed grass areas were seeded in early Fall 2018 but several areas <br /> were still being used by the general contractor at the time. Rather than hold up project <br /> closeout until the remaining areas can be seeded and grass established in late Spring 2019,the <br /> Town will accept the existing condition with a credit of$2,504.61. DPW will address the finish <br /> landscaping ourselves at a later date. <br />
The URL can be used to link to this page
Your browser does not support the video tag.