My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
01/23/2019 ZONING BOARD OF APPEALS ZBA Decision
>
01/23/2019 ZONING BOARD OF APPEALS ZBA Decision
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/24/2023 12:59:58 PM
Creation date
3/29/2019 2:38:36 PM
Metadata
Fields
Template:
Mashpee_Meeting Documents
Board
ZONING BOARD OF APPEALS
Meeting Document Type
ZBA Decision
Meeting Date
01/23/2019
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
18
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
MASHPEE ZONING BOARD OF APPEALS <br /> MEETING MINUTES <br /> JANUARY 23,2019 <br /> The Board requested the existing and proposed lot coverage to be written on the site plan, <br /> dated and initialed by the builder. <br /> Mr. Furbush read the Conservation and Inspection Department comments into the record. <br /> No comments from Board of Health. <br /> Mr. Bonvic made a motion to issue a Written Finding to John and Constance Henry for <br /> their deck project at 21 Kim Path with the following conditions; <br /> 1. The Board has determined that the applicant meets all the conditions of a Written <br /> Finding under Mass General Law 40A Section 6. <br /> 2. Proposed Septic System Uperade Plan -- 21 Kim Path, Mashpee, MA. Prepared <br /> for: Brian Smith, 42 Greendale Ave.,Needham, MA. Engineering by: Engineering <br /> Works, Inc., Scale V = 20', Drawn by: PTM, Job No.: 124-15, Date: 4122/15, <br /> Checked by: PTM, Sheet No. 1 of 3, Signed by: Peter T. McEntee, Registered <br /> Professional Engineer,No.: 35109. <br /> 3. Proieet Description: Sun Deck, Renovations for: John & Constance Henry, 21 <br /> Kim Path, Mashpee, MA. Prepared by: Clancy & Castano, LLC, PO Box 249, S. <br /> Dennis, MA, 508-240-4404, Date: 11/5/2018, Scale: 1" = 20', Sheet A-1 Rear <br /> Elevation, Left Side Elevation, and Right Side Elevation, Sheet A-2: Right Side <br /> Elevation (Proposed), Rear Elevation (Proposed), Left Side Elevation (Proposed), <br /> Sheet A-4: Deck Construction Guide. <br /> 4. Conditioned on all Town Department comments read into the record. <br /> 5. Referencing the site plan that Mark Clancy added lot coverage as of today's date <br /> is currently 9.32% and proposed is 12.16. <br /> Mr. Gould seconded. <br /> Mr. Blasdell, yes. <br /> Mr. Goldstein, yes. <br /> Mr. Furbush, yes. <br /> Mr. Bonvic, yes. <br /> All were in favor of the deck project. <br /> OTHER BUSINESS <br /> Approve Januaa 9 2019 Meeting Minutes <br /> Sharon moved to approve the meeting minutes. <br /> Mr. Gould seconded. <br /> Mr. Blasdell, yes. <br /> Mr. Furbush, yes. <br /> All were in favor to approve the minutes. <br /> 7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.