My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2/6/2007 WATERWAYS COMMISSION Minutes
>
2/6/2007 WATERWAYS COMMISSION Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/23/2019 5:04:10 PM
Creation date
4/23/2019 3:09:07 PM
Metadata
Fields
Template:
Mashpee_Meeting Documents
Board
WATERWAYS COMMISSION
Meeting Document Type
Minutes
Meeting Date
02/06/2007
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
. Barn l n Coastal Resgurces Committee 11VdgLe—GeraldDaly-Ido meeting <br /> 6. Wa=erwm s lumnagment Plan and Dredging Perms —Jim Harks <br /> Mashpee River Dredge Project—The contract for r odel g the three disposal scenarios—Islands, <br /> marsh from and side casting—is in effect between SMAST and Applied Coastal Engineering. <br /> The first nm, Mash Islands has been completed. Jim reported that the scenario created slight <br /> improvement in the area.above Orsini Beach, but there was slight degradation rear Gooseberry <br /> Island. He handed out copies of the report to the Selectmen, and the group discussed it. <br /> Maintenance Dredging—BSC has submitted all the applications for permits and has submitted <br /> several letters to various agencies (See Correspondence below). Joyce Mason has marked up a <br /> copy of the Memorandum of Agreement between Mashpee and the Department of Conservation <br /> and Recreation, and sent it back to ICF , but there has been no response yet. <br /> 7. Web,Site—Jinn Hanks <br /> No changes <br /> s <br /> . Public Accos—Vie., ..�. <br /> No new information <br /> NEW BUSMESS <br /> 1, Correspondence—November December Jan 06 for Feb 2007 meeting <br /> Incoming <br /> Ea-Mail <br /> o November,Brendan Annette,WBNERR, copy of I CR MLS on dredge material disposal on <br /> dead neck <br /> 14 November,Brendan Annett,acknowledging our mail saying we got the MOU hard copy and <br /> faxed to counsel <br /> 21 November,Norm Hayes,going ahead with sediment boring plan, will get more later if needed.I <br /> December,Becker Harris,Audubon,about easement For public access so we can nourish that area. <br /> December,Becky Harris,Audubon, -requesting map of area where material to be deposited <br /> December,Mike Oleksak,o.k. on dredging and leaving the pipe. <br /> 21 November,Norm Mayes,going ahead with sediment boring plan, will get more later if needed. <br /> Engineers <br /> BSC,Invoice <br /> BSC,copies of applications for permit renewal. <br /> BSC Copies of Sediment sieve analysis-Popponesset-12/14/06 and 12/22/06 � <br /> Woit Bay 12/14!06 <br /> Cape And islands Engineering,4 Dee 06,Relocate dock and reconstruct float, 8 Great River Road, <br /> Great River <br /> Cape and Islands Engineering, 15 Dec 06, Smith,266 Monomoscoy, Construct and maintain a dock <br /> etc.,Great River <br /> Cape and Islands Engineering, 15 Dee 06, Willis. 65 Hoopole Road,Pier Ramp,and Float,Johns <br /> Pond <br /> Page 3 o <br />
The URL can be used to link to this page
Your browser does not support the video tag.