Laserfiche WebLink
Mr. William Hauck <br /> June 13, 1997 <br /> Page 3 <br /> structural drawing 50.1 lists 80 p.s.ff for corridors above the first floor as the <br /> loading capacity. <br /> Item 13 - Occunancyfor Building <br /> The occupancy for the office areas of the building was planned for 125 based <br /> on the office layout and the program of use developed by the Town Hall and <br /> the Building Committee. <br /> Item 14 - Fire Walls/Construction Classification <br /> The General Contractor installed a 2-hour firewall separation between the <br /> original structure and the existing addition and closed off penetrations through <br /> the firewall as a part of the punch list scope of work. <br /> Item 15 - Accessibility Compliance <br /> This item was responded to in a letter dated May 30, 1997 from Strekalovsky <br /> & Hoit, Inc. <br /> Item 16 - Guard Rails <br /> The exterior guard rails will be installed.as per the discussions for the job site <br /> and as indicated on the attached partial plan. <br /> If you have any questions on the above information,please do not hesitate to contact us. <br /> Very truly yours, <br /> S OVSKY& HOIT, INC. <br /> ROGERO. OIT,A.I.A. <br />