Laserfiche WebLink
i <br /> Memormdum <br /> Mr.James VAcarro <br /> April 14, 1997 <br /> Page <br /> . L The roofmg subcontractor was contacted on Apnd 9, 1997 and made an <br /> inspection on the roof on April 10, 1997. The repair work will be accomplished <br /> during the week of April 14, 1997, <br /> 7. Lights -The electrical engineer is reviewing the control of the lighting throughout the <br /> building and will have a response by April 1 , 1997. <br /> . 0ec , -The contract documents call for the temporary electric service <br /> installation to be paid by the General Contractor. It also states that the cost of the <br /> usage is not chargeable to the Owner. <br /> 9. Credits rade;Gffs -we are reviewffig the changes in the paving as requested by <br /> Greg Taylor and we hope to have a cost proposal from the subcontractor by today's <br /> meeting. The General Contractor has also contacted the miscellaneous metals <br /> subcontractor con eming the exterior rails. This price should also be forthcoming. <br /> 10. eat_.,vsn.-The heating subcontractor was contracted on April 9, 1997 and will <br /> send a service technician to the,fob site on April 1 I or April 14, 1997. <br />