Laserfiche WebLink
STREKALOVSKY & HIT, INC. A. [. A. ARCHITECTS <br /> 1 NORTH STREET, HINGHA11 , IIIA 02943 (617) 749-4160 FAX (617) 740-4279 <br /> Memo <br /> To: James vaarro, Chairman <br /> Mashpee Torn Mall Building Counitte <br /> From: Roger 0. Holt <br /> ]ate: Aril 14 1997 <br /> Subject: Additions/Renovations <br /> Mashpee Town Hall, Mashpee, MA <br /> Below is the list of items presented at the April 9, 1997 Building Committee meeting. <br /> 1. Basem r - Condition of the existing 1960 building footing and foundation walls <br /> discovered during the excavation process made it impractical to meet the floor <br /> elevation noted in the construction documents. There were no "as-built" drawings of <br /> this building so that this condition was not discovered until the excavation was made. <br /> We are working with the General Contractor to develop-a possible solution which <br /> would allow this area to be designated as live storage instead ofdead storage and w <br /> will present any options to the Building Inspector and the Town Hall Building <br /> Committee as soon as they are available. <br /> 2. Schedule - 'Agostino Associates will present a completion schedule at the Monday <br /> April 14, 1997 joint meeting with the Board of Selectmen which under preliminary <br /> discussion with the General Contractor will commence on April 22, 1997 and be <br /> completed May 19, 1 997. <br /> . Riordan-The electrical filed subcontractor will be notified of the work schedule and <br /> if they do not staff the project, the General Contractor will complete the work. The <br /> General Contractor and the electrical engineer are in the process of preparing <br /> documentation as to the items for bacicharge. If a request for direct payment is <br /> received in accordance with the Chapter 149 regulations, we will assist you with a <br /> response. <br /> 4. Punch L - The punch list will be completed during the period of April 22 through <br /> May 24, 1997 when the Contractor is on the job site completing the contract work. <br /> . Building Violations - A response to the Building Inspector letter of February 21, 1997 <br /> has been forwarded on April 11, 1997. <br />