My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
4/14/1997 TOWN HALL BUILDING COMMITTEE Minutes
>
4/14/1997 TOWN HALL BUILDING COMMITTEE Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/24/2019 11:28:24 AM
Creation date
4/24/2019 11:18:22 AM
Metadata
Fields
Template:
Mashpee_Meeting Documents
Board
TOWN HALL BUILDING COMMITTEE
Meeting Document Type
Minutes
Meeting Date
04/14/1997
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
HANGE ORDER <br /> IA Document G701 Owner 0 <br /> Architect Q <br /> Contractor Q <br /> Field Q <br /> Other Q <br /> ROJECT: Additions and Renovations CHANGE ORDER NUMBER: 6 <br /> name, address) Mashpee Town Hall <br /> DATE: April 14, 1997 <br /> O CONTRACTOR: D'Agastino Associates, Inc. ARCHITECTS PROJECT NO. 95064 <br /> name, address) 46 Farwell Street <br /> Newton, MA 02160 CONTRACT DATE: May 10, 1996 <br /> CONTRACT FOR: Construction <br /> HE CONTRACT IS CHANGED AS FOLLOWS: <br /> Item#1 - Modify Boiler Room structure, removal wall $ 5,500 <br /> DA CP#17 (rev) <br /> Item#2- Complete installation of sprinkler system 11,000 <br /> DA CP#23 (rev) <br /> Item#3 - Install floor drain in Mechanical Room 3,800 <br /> DA CP#33 (rev) <br /> Item#4- Delete installation of new stair-ground to (6,000) <br /> first floor Stair#1 <br /> TOTAL CHANGE ORDER $ 14,300 <br /> ertifcation of Appropriation under M.G.L.W4,s3l C: Adequate funding in an <br /> mount sufficient to cover the total cost of this change order is available. <br /> By: Date: <br /> Not valid until signed by the Owner,Architect and Contractor. <br /> The original Contract Sum was: $ 1,486,900.00 <br /> Net change by previously authorized Change Orders $ 119,470.00 <br /> The Contract Sum prior to this Change Order was $ 1,606,370.00 <br /> The Contract Sum will be increased by this Change Order in the amount of $ 14,300.00 <br /> The new Contract Sum including this Change Order will be $ 1,620,670.00 <br /> The Contract Time will be unchanged <br /> The date of Substantial Completion as of the date of this Change Order therefore is Feb. 1, 1997 <br /> Note: This summary does not reflect changes in the Contract Sum, Contract Time or Guaranteed Maximum Price which have been <br /> authorized by Construction Change Directive <br /> Town of Mashpee <br /> Strekalovsky & Hoit, Inc. D'Agostino Associates, Inc. Board of Selectmen <br /> Architect Contractor Owner <br /> 51 North Street 46 Farwell Street 16 Great Neck Road North <br /> Address Address Address <br /> Hingha 02043 Newton, MA 02160 Mashpe ,/M 02649 <br /> By. By: By. C£ C <br /> Date: il Ah Date: Date: / "�7 "yo <br />
The URL can be used to link to this page
Your browser does not support the video tag.