My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1/16/1997 TOWN HALL BUILDING COMMITTEE Minutes
>
1/16/1997 TOWN HALL BUILDING COMMITTEE Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/24/2019 5:02:33 PM
Creation date
4/24/2019 11:38:34 AM
Metadata
Fields
Template:
Mashpee_Meeting Documents
Board
TOWN HALL BUILDING COMMITTEE
Meeting Document Type
Minutes
Meeting Date
01/16/1997
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
18
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Town o Mash ee <br /> Waslipce, Massachusetts 02649 <br /> MEMO <br /> Re: I as pee Torn Hatl <br /> Prelinihiary Inspection Items <br /> 1. 44 items on attached Fire Department List <br /> . Install copper flashing per general roof rote and plan I A 1. <br /> . Install step flashing per detail 1.5 as required at chimney, cupola, dormers <br /> stairwell#2 wall at the existing r6of line on plan AIA <br /> . Complete upper level exterior face wall at stairwell#2- <br /> 5. Guard rail of 42 inches required at stairwe # l, add to existing. <br /> . Guard rail o f 42 inches required at all window wells. Detail 1 L 1.3 does meet code <br /> requirements as shown. <br /> . Detail 12/1,13 for exit stair at existing portables does not meet the guard rail <br /> requirements of 42 inches per 780 CMR Section 827.2. Future requirement. <br /> 8. Elevator is not operable. <br /> . Electrical engineer must by letter and signature approve the use of a temporary <br /> oo amp panel and the requiredTiring. <br /> 10. Exit sign required at end of hall at the main lobby. <br /> 11. The gear exit at the elevator lobby does not meet code requirements. A temporary <br /> plan must be submitted. <br /> 12. The architect must certify and submit a complete boiler plate for the building <br /> which gives 1. use group, 2. construction classification by area, 3. occupancy load by area, <br /> . flog loading for total building. <br /> 103 The architect must complete the requirements of the previous letters to avoid <br /> violation of 780 CMR Section 127. <br /> 14. All mechani a l systems must be balanced and verified by the engineer. <br />
The URL can be used to link to this page
Your browser does not support the video tag.