Laserfiche WebLink
Page 3 <br /> Town Hall Building Committee <br /> N&utes <br /> February 7, 1996 <br /> TOWN WATER JEU <br /> For the record,b4r. Bucldngham indicated that the Town Fall Building <br /> Committee has naintaxned extreme interest in providing'Town water t <br /> F <br /> the Town Fall facility, <br /> Due to budget constraints,the Town Hall water main project has not <br /> been vigorously pursued. *It was noted that plumbing for the fire <br /> suppression system has been included in the design and budget of the <br /> Town Hall renovation/restoration project. The Committee has worked <br /> with the Eire Chief with respect to this regard. <br /> It was noted that water requirements were discussed with Alas McQuaid, <br /> Board of Health Agent. The current well is of proper size and distance <br /> and is currently under monitoring at this time. <br /> Discussion followed with respect to the installation of Town water to <br /> the Town Hall facility as it relates to phase H of the project scope. <br /> lir.Hoit indicated that obtaining Town water is the most preferred option. <br /> He recommended the Committee move forward with this important matter <br /> in a hely fashion. <br /> `It is the consensus of the Committee to authorize the Architect to <br /> include the placement of a 5" water line from the Town"Hall facility <br /> to the road within the scope of the renovation restoration project. <br /> *It is the consensus of the Committee to authorize the Executive Secretary <br /> to request assistance Brom the Capital Irnprovement Committee for the <br /> purpose of obtaining funds for the Town Mall water main connection. <br />