My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
7/25/1996 TOWN HALL BUILDING COMMITTEE Minutes
>
7/25/1996 TOWN HALL BUILDING COMMITTEE Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/24/2019 5:06:02 PM
Creation date
4/24/2019 1:30:51 PM
Metadata
Fields
Template:
Mashpee_Meeting Documents
Board
TOWN HALL BUILDING COMMITTEE
Meeting Document Type
Minutes
Meeting Date
07/25/1996
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
19
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
f 3 <br /> Project R plres ntative"s Daily Report Page 3 o <br /> Report No. 10 <br /> Date: 712196 <br /> Architect: strekalovsk Holt, Inc. Day: M. T W TFC F <br /> Project: Mashpee Town Hall Contractor 'Agostino Associates <br /> Superintendent: Len Faoletta <br /> Weather. 8:00 All -. Noon: P �: <br /> Temperature: :00 AM loon: 4PM: <br /> PERSONNEL COUNT Spec. Contractor Trade Workforce <br /> Sect. Foreman Journeymen Helpers otai <br /> General <br /> Contractor: <br /> Subcontractors: <br /> TOTAL <br /> Dotes: g air conditionerfor the months of July&August, h thermometer, <br /> (i) waste basket, ' water cooler wl water supply <br /> General contractor installed a p!ywood sheathed, 2"x 4"stud barrier <br /> across the end of Corridor#1, First Level-to aid In directinq town <br /> ern la ees to a isUng Computer Room. An additional plywood barrier was <br /> erected across the entrance opening to the lain Lobby. <br /> A Building Committee and Job Meeting was held'on site from 10:30 A. I. until <br /> Noon. Both the A.T. & T. and NYN X representatives were at the meeting <br /> to assist in giving the question of phone service some direction. <br /> After the meeting, Mr. R. holt reviewed face brick sarrr les and selected <br /> the stives & Hart French Belgians sample as that sample matching <br /> exWing conditions most cl sel . <br /> Number ley to xnspe b. electric typewriter <br /> 1.Work performed by General Contractor 10.Site meeting participants and discussion <br /> .Work performed by SLbcontrators 11.Variations from plans and specs.,instigator,action <br /> .Work items or extra started taken,contrs.seeking comp n.r item,labor and <br /> .Work items or extra completed materials <br /> .Potential or encountered delays 12.Description of job incidents and remarks <br /> .Serious accidents 13.Material and equipment for installation received, <br /> .Visitors and reasons compliance to specs, <br /> .Testing or inspection 14.Work not meeting specifications <br /> .Equipment on site 15.Items in 14 not corrected. <br /> Signed: <br /> Copies to: Staff <br />
The URL can be used to link to this page
Your browser does not support the video tag.