Laserfiche WebLink
1 , <br /> P <br /> Protect Representative's Daily Report Page f <br /> 3 <br /> Report No. t <br /> Date: T <br /> Architect: Strekalovsky & Hoit, Inc. Day: M T W TSI F <br /> Project: Mashpee Town Hall Contractor '#gostino Associates <br /> SupeNntendent: Len Paoletta <br /> Weather. 8:00 AM Noon: P ::,. <br /> Temperature: 84DOO Ahs Noon: PM: <br /> ,w <br /> PERSONNEL I EL UNT Spec. Contractor Trade Workforce <br /> Sect. Foreman Joumeymen Helpers otarl <br /> General <br /> Contractor: <br /> Subcontractors* <br /> TOTAL <br /> Notes: to work in such a manner on this site. After brief a olo ies from the work crew., <br /> Mr. FeeneK said he r ould ust issue a warning. However, since no one on site <br /> has a license to operate a bobcat-the demolition work continued on, in much <br /> the traditional manner, without the aid of a bobcat Until a qualified E.O. can <br /> e found, this may cause some deka in schedules. <br /> The writer seized this 9pportunity opportunityto suggest and oint out to the.Job Su t. <br /> -activity to be pursued in the following areas: , . <br /> . Signage-Let people know this is a construction site-a hard hat area <br /> no trespassing. <br /> NOTE: The general public is beginning to park in the front parking to and <br /> eater into and wander about the building- using the excuse that they are looking <br /> for the public phones. This activity must Ee stopped and controlled. <br /> . First slid Kit Su lies <br /> . Fire Extinguishers of the ecified type. <br /> . Hard Prat for visitors <br /> . Field office set-up as fllovr : a aleck, electric #fir ewrter, Jsteel <br /> file cabinet wl lock & key <br /> (bg, lan tables a overhead sheff, chairs <br /> Number Key to lnspe b. electric typewriter i <br /> 1.Work performed by General Contractor 10.Site meeting participants and discussion <br /> .Work performed by Subcantrators 11.Variations from pians and specs.,instigator,action <br /> .Work items or extra started taker,contrs.seeking compen.,item,labor and <br /> .1 Workitems of extra completed material <br /> .Potential or encountered delays 12.Description of job incidents and remarks <br /> .Serious accidents 13.Material and equipment for installation received, <br /> 7.V1 5ftors and reasons compliance to specs. <br /> .Testing or inspection 14.Work not meeting specifloaGtions <br /> .Equipment on site 15.items in 14 not corrected. <br /> Signed: <br /> Copies to: -Staff <br />