Laserfiche WebLink
Y <br /> I <br /> ProjectRepresentative's Daily Report Page 1 of <br /> Report No. 10 <br /> Date: 7/Z/9 <br /> Architect: Strekalot s oit, Inc. Day: f 1 1I TH P <br /> Project: Mashpee Town Hall Contractor 'A ostino Associates <br /> Supermen nt: Len Faoletta <br /> Weather: :00 AM ha some fog--- Moon: __jpartly sunny QPM:,partly sunny <br /> Temperature: 8:00 Ailk - 4 _ Noon: 84 4PM6 <br /> 73 <br /> PERSONNEL COUNT Spec. Contractor Trade Workforce <br /> Sect. Foreman Journeymen Helpers Total <br /> General <br /> Contractor: ! 'Agostino 1 Job Supt. I Laborer <br /> Subcontractors: Riordan 1 Foreman 1 Electrician <br /> J.J Enterprises I Foreman 1 Laborer 2 <br /> TOTAL <br /> Notes: Equipment on site: 1 Bobcat, 2 Dram stens <br /> Electrical sorb-contractor resumed distribution work. Unistrut support brackets <br /> are being installed in corridor#1., First Floor. <br /> The demolition sorb-contractor continued to work on removing the remaini r <br /> C.M.U. walls in the area of what used to be Public 1 estrooms Lobb . The <br /> Equipment Operator for this sub-contractor had made no more than six(6). <br /> asses-back and forth from the building to the dumpster, when he was <br /> stopped from 92erating the bobcat by an ins a tion team from the <br /> Commonwealth of MAY a t. of Public Safe lvision of Inspections. <br /> Mr. Fe ne , District En ineerir� ins ector, asked both of the demolition sub- � <br /> contractors if they had a license tooperate the bobcats Both gmenlooked <br /> at one another,smiled... replied in the negative. Where p n, lir. Feene r <br /> informed them, that this was a grave violation of the Commonwealth Laver, <br /> punishable by a$500.00 Fine. At this point the,Jab Supt introduced himself <br /> and was duly informed by Air. Feene Z that he, lir. Paoletta could be fined <br /> $3000.00 and faced a prison sentence for alloffLn these gfnffemen to work <br /> Number ley to inspectionNotes: <br /> 1.Work performed by General Contractor 10.Site meeting participants and discussion <br /> .Work performed by Subcontratars 11.Variations from plans and specs.,instigator,action <br /> .Work items or extra started taken,contrs.seeking compen.#item,labor and <br /> .Work R ms or extra completed materials <br /> a.Potential or encountered delays 12.Description of job incidents and remarks <br /> .serious accidents 13.Mater al and equipment for installation received, <br /> .NAsitors and masons compliance to specs. <br /> .Testing or inspection 14.Work not meeting specifications <br /> .Equipment on site 16.sterns in 14 not corrected. <br /> CopiesSigned: <br /> to; oaf <br />