My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
7/25/1996 TOWN HALL BUILDING COMMITTEE Minutes
>
7/25/1996 TOWN HALL BUILDING COMMITTEE Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/24/2019 5:06:02 PM
Creation date
4/24/2019 1:30:51 PM
Metadata
Fields
Template:
Mashpee_Meeting Documents
Board
TOWN HALL BUILDING COMMITTEE
Meeting Document Type
Minutes
Meeting Date
07/25/1996
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
19
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
R <br /> i <br /> I <br /> Project Representative's Daily Report Page 1 of 1 <br /> Report No. <br /> Date: 711196 <br /> Architect: strekalovsk !Molt, Inc. Day: M T ' -f`H F <br /> Project: Mashpee Town Mall Contractor 'Agostino Associates <br /> Superintendent: Len Paoletta <br /> Weather: :00 AM cloudylsorne fog Noon: pt. sunny PM: pt. cloudy <br /> Temperature: *00 AM 58 Noon: 86 4PM: 69 <br /> PERSONNEL COUNT . . Contractor Trade Workforce <br /> Sect. Foreman Journeymen Helpers Total <br /> General <br /> Contractor: DAgostino 1 Job sups. <br /> Subcontractors: JJ Enter rise Demolition(508)872-9763 <br /> TOTAL. <br /> Dotes: Equipment on site: I Bobcat, 2 Dumpsters <br /> Demolition crew began work on first level women's and mems public rest rooms and <br /> custodial closet. Existing toilet fixtures in both these areas have long since been <br /> removed andlor smashed. subcontractor begafi removing toilet partitions and CMU <br /> wars with Bobcat. <br /> Additional demolition work was started In the following areas-Assessing, Treasurer, <br /> Tax collector, Town Clerk, Elections and Meeting Rooms. <br /> Number Key to Inspection Dotes: <br /> 1.Work performed by General Contractor 10.Site meeting participants and discussion <br /> .Work performed by Subcontrators 11.Variations from plans and specs.,instigator, action <br /> .Work items or extra started taken,contr .seeking compen.,iter,labor and <br /> 4.Work items or extra completed materials <br /> .Potential or encountered delays 12.Description of job incidents and remark <br /> .Serious accidents 13.Material and equipment for installation received, <br /> 7.Visitors and reasons compliance to specs. <br /> .Testing or inspection 14.Work not meeting specifications <br /> g.Equipment on site 15. items in 14 not corrected. <br /> Copies o: Staff Signed: • <br />
The URL can be used to link to this page
Your browser does not support the video tag.