Laserfiche WebLink
Project Representative's Daffy Report Page 1 of I <br /> Report N . 15 <br /> Date: 719196 <br /> Arch itect: s rekalo vsk bait, Inc. Day: III VII TH P <br /> Project: Mashpee Town Mall Contractor D"A gostino Associates <br /> Superintendent: Len Paoletta <br /> Weather 8:00 AIV cloudy Noon: pt. cloudy PM: pt cloudy <br /> Temperature: 8:00 AM 69 Moon: 86 4PM*. 74 <br /> PERSONNEL f EL COUNT Spec. Contractor Trade Workforce <br /> Sect. Foreman Journeymen Helpers Total <br /> General <br /> Contractor: "Agostino 1 ,Job Supt. <br /> Subcontractors: ,J,J EnterpriselDemolition 1 4 <br /> Riordan Electric <br /> TOTAL <br /> Notes* Demolition subcontractor is continuing to remove construction debris from first hirel <br /> floor slab area. Two of these men were assigned to take apart and remove boiler# . <br /> In the process, a water line was cut and, as the Job plumber was not available, the <br /> .Job Supt. has to use the "Town Plumber"to cap off the leaking lure. <br /> Electrician worked on power distribution and general devices in the Meeting Room <br /> area-first level. 70 L. . of 314-inch conduit alond with 3 to 4 sq. in.junction boxes <br /> were installed in the overread. Unistrut brackets are being installed along the Center <br /> CMU bearing wall. <br /> Number fey to Inspection Notes: <br /> 1.Work performed by General Contractor 10.Site meeting participants and discussion~ <br /> .Work performed by Subcontrators 11.Variations from plans and specs., instigator, action <br /> .Work items or extra started taken,contrs.seeking compen.,item*labor and <br /> 4.Work items or extra completed materials <br /> .Potential or encountered delays 12.Description of job incidents and remarks <br /> . Serious accidents 13.Material and equipment for installation received, <br /> .Visitors and reasons compliance to specs. <br /> .Testing or inspection 14.Work not meeting specifications <br /> g. Equipment on site 15. Items in 14 not corrected. <br /> Copies t : staff Signed: <br />