i <br /> I <br /> Project Representative's Daily Report Page 1 of <br /> Report No. t <br /> Date: 7110196 <br /> Architect: Strekalovsl Holt, Inc. Day: M T �:��TH F <br /> Project: Nash ee Town Mall Contractor D"Agostino Associates <br /> Superintendent: Len Paoletta <br /> Weather. :00 All paunny Noon: partly sunny 4PM-. paqLysunny <br /> Temperature: :oo AM 67 Noon: 83 4PM: 77 <br /> PERSONNEL C UNT Spec. Contractor Trade Workforce <br /> Sect. Foreman Journeymen Helpers Total <br /> General <br /> Contractor: D'Agostino I Job Supt. 1 Laborer 2 <br /> Subcontractors: Riordan 1 Foreman 2 Electricians <br /> JJ Enterprises I Foreman 4 Laborers <br /> TOTAL. 101 <br /> Notes: General Contractor has set up staging shores on both sides of existing C.M.U. <br /> bearing gall in pro used assessing area prior to the removal of sane wail-see <br /> DrW .t <br /> Acting on instructions received from Mr. R. Holt, the writer requested that the <br /> .lob Supt prepare and submit a proposal regarding the existing framing <br /> irregularities found in the overheadliower level-See Daily Report#14 mated <br /> 718196 <br /> .lob Supt. was reminded of need for Bard hats and site clean up. Particularly, <br /> an absorbent material needs to be spread over areas tka�t_#ppear to have had <br /> suffered an off leak ors ffl. <br /> Demolition sub-contractor removed both the remainder of Boiler#2 and all of <br /> Boller#1. Sections of boiler cast iron that are being stacked on frontarlri <br /> apron were questioned b the Job Su t* The Demolition Crew Foreman <br /> Unformed the Supt that all the cast iron would be removed A.S.A.P. <br /> 11 concrete housekee ing pads have been removed from both boiler rooms. <br /> Number Keir to lnspe0t ori otes: <br /> 1.Work performed by General Contractor 10.Site meeting participants and discussion <br /> .Work performed by Subcontratiors11.Variations from pians and specs.,instigator,action <br /> .Work items or extra started taken,contr .seeking cornpen.,item,labor and <br /> .Work items or extra completed materials <br /> .Potential or encountered delays 12.Description of job incidents and remarks <br /> .Serious accidents 13.Material and equipment for installation received, <br /> 7.Visitors and reasons compliance to specs. <br /> .Testing or inspection 14.Work not meeting specifications <br /> 9.Equipment on site 1 S.Items in 14 not corrected. <br /> Copies to. Staff Signed:yan,LLA <br />