My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
7/25/1996 TOWN HALL BUILDING COMMITTEE Minutes
>
7/25/1996 TOWN HALL BUILDING COMMITTEE Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/24/2019 5:06:02 PM
Creation date
4/24/2019 1:30:51 PM
Metadata
Fields
Template:
Mashpee_Meeting Documents
Board
TOWN HALL BUILDING COMMITTEE
Meeting Document Type
Minutes
Meeting Date
07/25/1996
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
19
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Project Representative's Daily Deport Page 1 of <br /> Report No. f <br /> Date: 77111196 <br /> Architect: Strekalovsky&bolt, Inc.-- Darr: M T W 0 F <br /> Project: Mashpee Town Hall Contractor D'Agos rfro Associates <br /> Superintendent: Len Paoletta <br /> Weather: 8:00 AM sunny Noon: pt. sunny PS I: sunny <br /> Temperature: :00 All 64 Noor: 84 4PM: 77 <br /> PERSONNEL COUNT Spec. Contractor Trade Workforce <br /> Sect. Foreman Journeymen Helpers Total <br /> General <br /> Contractor: D"Agostino I .Job Supt 1 Engineer <br /> Subcontractors: Riordan Electric 1 2 <br /> J.J. 1 3 <br /> Enterprises <br /> TOTAL <br /> Notes: .Job Supt. Brough on site and stored in the job Supt. office the following: <br /> 7 First Aid Kits 7 case of hard hats,, 2 ABC fire extinguishers. <br /> Electrician is working on lighting In the Town Clerk, Electfon Areas. <br /> Demolition subcontractor removed misc. piping, expansion tanks, radiators and piled <br /> same on top of existing pile of oast iron debris in front parking area. This has been <br /> pointed out as undesirable to the,Job. Sup#. Subcontractor began clean up int the <br /> lover level. <br /> Number Key to InspectionNotes: <br /> I.Work performed by General Contractor 10. Site meeting participants and discussion <br /> .Work performed by Subcontrators 11.Variations from plans and specs.*instigator,action <br /> .Work items or extra started taken,contr .seeking compen.,Item,tabor and <br /> .Work items or extra completed materials <br /> .Potential or encountered delays 12.Description of job incidents and remarks <br /> . Serious accidents 13. Material and equipment for installation received, <br /> .Visitors and reasons compliance to specs. <br /> .Testing or inspection 14.Work not meeting specifications <br /> . Equipment on site 15. Items in 14 not corrected. <br /> Copies o: Staff Signed: <br />
The URL can be used to link to this page
Your browser does not support the video tag.