My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
7/25/1996 TOWN HALL BUILDING COMMITTEE Minutes
>
7/25/1996 TOWN HALL BUILDING COMMITTEE Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/24/2019 5:06:02 PM
Creation date
4/24/2019 1:30:51 PM
Metadata
Fields
Template:
Mashpee_Meeting Documents
Board
TOWN HALL BUILDING COMMITTEE
Meeting Document Type
Minutes
Meeting Date
07/25/1996
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
19
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
r <br /> r <br /> Project Representative's Daily Report Page I of <br /> Report No. 1i <br /> Date: 7115196 <br /> Architect: Strekalovsky& Hoi, Inc. Day: T W TH P <br /> Project: I ashpee Town Hall Contractor DAgostino Associates <br /> Superintendent: Len Paoletta <br /> Weather: :00 AM foglovcstlh id Noon: same PM: same <br /> Temperature: 00 AM 72 Noon: 79 4PM: 76 <br /> PERSONNEL COUNT Spec. Contractor Trade Workforce <br /> Sect. Foreman Journeymen helpers Total <br /> General <br /> Contractor; D'Agostino 1 Job Supt. 1 <br /> Subcontractors: Riordan <br /> Boston Contract Drilling 1 1 <br /> JJ Enterprises 7 <br /> TOTAL 71 <br /> [Votes: Boston Contract Drilling and Sawing unable to work as the sa elsingle electrician <br /> does not have a key to the Electrical Job Box to access toolslrrraten'als to install <br /> whip for Boston Contract. This at the least means a wasted day for two subcontractors <br /> passible delay claims and backcharges. <br /> Demolition subcontractor performing demolition work on the first level in the <br /> proposed Personnel, Comp. Equip., Data Proc. and Exec. sec'y areas. Clean up is <br /> continuing throughout the building. <br /> Job Supt. installed therrnome er and water supply(Poland Spring). <br /> Number Fey to inspectionNotes: <br /> 1.Work performed by General Contractor 10.Site meeting participants and discussion <br /> 2.Work performed by Subcontrators 11.Variations from pians and specs.*instigator,action <br /> .Work items or extra started taken,contrs.seeking compen.,item,labor and <br /> .Work items or extra completed materials <br /> .Potential or encountered delays 12.Description of job incidents and remarks <br /> .Serious accidents 13.Material and equipment for installation received, <br /> .Visitors and reasons compliance to specs. <br /> 8.Testing or inspection 14.Work not meeting specifications <br /> .Equipment on site 15. Items in 14 not corrected. <br /> Copies to; staff Signed: • <br />
The URL can be used to link to this page
Your browser does not support the video tag.