My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
7/25/1996 TOWN HALL BUILDING COMMITTEE Minutes
>
7/25/1996 TOWN HALL BUILDING COMMITTEE Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/24/2019 5:06:02 PM
Creation date
4/24/2019 1:30:51 PM
Metadata
Fields
Template:
Mashpee_Meeting Documents
Board
TOWN HALL BUILDING COMMITTEE
Meeting Document Type
Minutes
Meeting Date
07/25/1996
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
19
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Project Representative's Daily Report Page t of 1 <br /> Report No. 20 <br /> Date: 7116196 <br /> Architect: strekalovsky& Hoit, Inc. Day: 1111 T 1111 TH F <br /> Project: Mashpee Town Hall Contractor DAgostino Associates <br /> Superintendent: Len Paoletta <br /> Weather :00 AM partly sunny Noon: sunny PM: sunny <br /> Temperature: 8:00 AM 72 Noor: 99 PM: 85 <br /> PERSONNEL COUNT Spec. Contractor Trade Workforce <br /> Sect. Foreman Journeymen Helpers Total <br /> General <br /> Contractor. `Agostino 1 Job Supt. t <br /> Subcontractors: Riordan t Electrician <br /> Boston Contract Drilling 1 Foreman t <br /> J.J Enterprises 1 Foreman 2 Laborers 3 <br /> TOTAL <br /> Notes: Electrical sub-contractor on site for one hour with key to job box and accessed <br /> oolslmaterials to make up whip for Boston Contract Drilling, who began saw <br /> cutting existing floor slab in new Vault, Town Clerk, Elections Area, in <br /> preparation for excavation work. <br /> Demolition stab-contractor is removing existing ceiling joists and partitions <br /> within and over area of new stairwell and elevator. Writer informed Job Supt <br /> that the demolition sub-contractor's work crew appears to be getting <br /> progressively smaller as we advance into contract. <br /> A job meeting was held in Conference Room Trailer this A.M. with the building <br /> committee in attendance. A walk-thru of the site was conducted by Mr. R. Hoit <br /> afterwards. <br /> Number Key to InspectionNotes: <br /> #.Work performed by General Contractor 10.site meeting participants and discussion <br /> 2.Work performed by Subcontrators 11.Variations from plans and specs.,instigator, actian <br /> 3.Work items or extra started taken,contrs.seeping compen., item,labor and <br /> .Work items or extra completed materials <br /> .Potential or encountered delays 12.Description of job incidents and remarks <br /> .serious accidents 13.Material and equipment for installation received, <br /> .Visitors and reasons compliance to specs. <br /> 6.Testing or inspection 14.Work not meeting specifications <br /> g.Equipment on site 15. Items in 14 not corrected. <br /> Copies to: staff Signed: <br />
The URL can be used to link to this page
Your browser does not support the video tag.