My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
8/1/1996 TOWN HALL BUILDING COMMITTEE Minutes
>
8/1/1996 TOWN HALL BUILDING COMMITTEE Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/24/2019 5:05:51 PM
Creation date
4/24/2019 1:31:20 PM
Metadata
Fields
Template:
Mashpee_Meeting Documents
Board
TOWN HALL BUILDING COMMITTEE
Meeting Document Type
Minutes
Meeting Date
08/01/1996
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Project Representative's Daily Report Page I of I <br /> Report No. 31 <br /> Date: 818196 <br /> Architect: s rekalovsky&Hoit, Inc. Day: M T W TH F <br /> Project: Mashpee Town ball Contractor D"A ostirro Associates <br /> Superintendent: Len Paoletta <br /> Weather: 8:00 AM HazylHumid Noon: s n Ha 4PM-. sun ra y <br /> Temperature: 8:00 ASI 68 Boon: 87 4PM: 79 <br /> PERSONNEL EL COUNT Spec. Contractor Trade Workforce <br /> Sect. Foreman Journeymen Helpers Total <br /> General <br /> Contractor. "A ostirro 1 lob Supt. I <br /> Masonry 2 <br /> Subcontractors: <br /> J.J. Enterprises <br /> TOTAL 71 <br /> Notes: Demolition crew is performing a miscellany of scheduled demolition work along <br /> with a general clean-up of all floors and site. <br /> Masons continued with pointing and repair wort on the first level., north end <br /> f building. PM door frame#115 was installed. <br /> Number Key to InspectionNotes: <br /> 1.Work performed by General Contractor 10.site meeting participants and discussion <br /> .Work performed by Subcontrators 11.Variations from plans and specs.,instigator,action <br /> .Work items or extra started taken,contrs.seeking compen., item,labor and <br /> .Work items or extra completed materials <br /> . Potential or encountered delays 12.Description of job incidents and remarks <br /> .serious accidents 13.Material and equipment for installation received, <br /> .Visitors and masons compliance to specs. <br /> 8.Testing or inspection 1 .Work not meeting specifications <br /> . Equipment on site 15. Items in 14 not corrected. <br /> Copies to: staff Signed: 9 <br />
The URL can be used to link to this page
Your browser does not support the video tag.