My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
8/1/1996 TOWN HALL BUILDING COMMITTEE Minutes
>
8/1/1996 TOWN HALL BUILDING COMMITTEE Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/24/2019 5:05:51 PM
Creation date
4/24/2019 1:31:20 PM
Metadata
Fields
Template:
Mashpee_Meeting Documents
Board
TOWN HALL BUILDING COMMITTEE
Meeting Document Type
Minutes
Meeting Date
08/01/1996
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
ProjectRepresentative's Daily Deport Page I of 1 <br /> Report No. 36 <br /> Date: 31719 <br /> Architect: Strekalovsky&Hoit Inc. Day: M T 1111 TH F <br /> Project: Mashpee Town ball Contractor "Agostino Associates <br /> Superintendent: Len Paoletta <br /> Weather: 8:00 AM Foggy Noon: SunlHazy 4PM4, sun ra y <br /> Temperature: 8:00 AM 72 Noon: 87 4PM*. 83 <br /> PERSONNEL UNT Spec. Contractor Trade Workforce <br /> Sect. Foreman Journeymen Helpers Total <br /> General <br /> Contractor: D'Agostino I .lob Supt. <br /> Masonry 2 <br /> Cement Finishers <br /> Subcontractors: <br /> TOTAL 8 <br /> Notes: Elevator footing was poured early today. Excavation work has begun at the vault <br /> area. Existing eastern CIBC!wall in director's office has been repaired!and CMU wall <br /> between assessing and tax collector has been repaired. <br /> Door Frame#102 has been installed. <br /> All cast iron and copper piping runs in the lower level storage room have been removed <br /> except for the direct runs tot eh existing septic pits. Job Supt. remarked that h <br /> wants plumbing sub-contractor to remove these. <br /> Number Key to inspectionNotes: <br /> 1.Work performed by General Contractor 10.Site meeting participants and discussion <br /> .Work performed by subcontrators 11.Variations from plans and specs.,instigator,action <br /> .Work items or extra started taken,contrs.seeking compen., item,labor and <br /> .fork items or extra completed materials <br /> .Potential or encountered delays 12.Description of job incidents and remarks <br /> 6 <br /> . erios accidents 1 .Material and equipment for installation received, <br /> 7.Visitors and reasons compliance to specs. <br /> .Testing or inspection 14.Work not meeting specifications <br /> g.Equipment on site 15.Items in 14 not corrected. <br /> Copies to: staff Signed: <br />
The URL can be used to link to this page
Your browser does not support the video tag.