Project Representative's Daily Report Page 1 of <br /> Report No. 2 <br /> Date: 7131196 <br /> Architect: strealovslty& Holt, Inc. Day: M T X111 TH F <br /> Project: Mashpee Town ball Contractor D Agrostino Associates <br /> Superintendent: Len Paoletta <br /> Weather: &00 AM CidylHumid Moon: Cloudy 4PM- RaInICIdy <br /> Temperature: 8:00 AIV 61 Noon: 76 4PM: 6 <br /> PERSONNEL COUNT Spec. Contractor Trade Workforce <br /> Seat. Foreman Journeymen Helpers Total <br /> x <br /> General <br /> Contractor: ' gostino I ,Job Supt. <br /> Subcontractors: <br /> J.J. Enterprises <br /> Boa's Excavating <br /> TOTAL 1 7 j <br /> Notes: Excavating subcontractor is working In area of new entrance stair and east sive addition <br /> to building. several foundation wails have been uncovered and appear to be the remnant <br /> of old areaways, and an old stair. None of the walls had footers and were tial to the <br /> building foundation wall with what appears to be 348 bars a@ 12'0+1-at top of walls. <br /> The best guess is that these were frost galls only. There was no slab work or abandoned <br /> drains at what appeared to be the bottom of the areaways. Excavated earth is a sandy <br /> soil. <br /> Demolition work crew has removed the masonry infill panels from the existing east <br /> foundation wall, lower level. <br /> The existing unit ventilator alond the exterior wall in storage area adjacent to meeting <br /> rooms has been removed, leaving a large opening at ground level approx. 6-0"+/- <br /> long <br /> - <br /> 1 ng x 2"6"+/-high. No provisions have been made to make up temporary closure panels <br /> The building is wide open. <br /> In attempting to remove sections of existing excavated concrete foundation walls, <br /> the equipment operator for the demolition subcontractor placed a strain on the right <br /> hydraulic ram on the Bobcat bucket, and the ram gave way. The Bobcat is in creed <br /> of repairs before being operated again. <br /> Towards the end of the work clay, the Town of Mashpee Bldg. Inspector, Mr. <br /> William Hauch, approached both the.Job Supt and writer and voiced certain complaints <br /> about the following site conditions: <br /> 1 Temporary power panels on 4x4''mast head at end of temporary municipal offices <br /> are open to the weather. Mr. Hauck wants to see theca enclosed and weather- <br /> proofed! Note: attempts were made by the writer to point out that DAgostino <br /> Associates had no wart in the construction of the temporary power parcels- Other <br /> parties had let the contract to a separate electrical cubcontractor. <br />