Laserfiche WebLink
Project Representative's Deify Report Page 2 of 2 <br /> Report No. 27 <br /> Date: 7131196 <br /> Architect: Strekalovsky&Hoit., Inc. Davy: M T W TH F <br /> Project: A ashpee Town Hall Contractor D"Agostino Associates <br /> Superintendent: Leri Paolefta <br /> Weather: 8:00 AM goon: PM: <br /> Temperature: : o AM Avon: PI S: <br /> Notes: . The existing building is "unsafe"at present time. Many openings reed to be closed <br /> off in a proper manner to secure buildings. At present anyone can walk into., and <br /> through any part of building. <br /> If the Bldg. Inspector's above complaints are nor properly addressed, Mr. Hauck will <br /> issue a stop work order. <br /> Writer informed project architect, Ms. Jeanine Delongchamp of Strekalovsky& Hoit, <br /> Inc. of the above conditions. <br /> Number Key to Inspection dotes: <br /> 1. Work performed by General Contractor 10. Site meeting participants and discussion <br /> . fork performed by Sub ontrators 11. Variations from plans and specs., instigator, action <br /> . Work items or extra started taken, contrs. seeking compen., item, labor and <br /> . Work items or extra completed materials <br /> . Potential or encountered delays 1 . Description of job incidents and remarks <br /> . Serious accidents 13. Material and equipment for installation received, <br /> . Visitors and reasons compliance to specs. <br /> . Testing or inspection 14. Work not meeting specifications <br /> . Equipment on site 15. items in 14 not corrected. <br /> Copies to: staff Signed. j4ue�� <br />