My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
8/1/1996 TOWN HALL BUILDING COMMITTEE Minutes
>
8/1/1996 TOWN HALL BUILDING COMMITTEE Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/24/2019 5:05:51 PM
Creation date
4/24/2019 1:31:20 PM
Metadata
Fields
Template:
Mashpee_Meeting Documents
Board
TOWN HALL BUILDING COMMITTEE
Meeting Document Type
Minutes
Meeting Date
08/01/1996
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Project Representative"s Daily Report Page 1 o1 2 <br /> Report No. 2 <br /> Date: 811196 <br /> Architect: Strekalovslry&1 oit, Inc. Day: M T 1111 TH F <br /> Project: Mashpee Town Hall Contractor D#Agostino Associates <br /> Superintendent: Len Paoletta <br /> Weather: 8:00 AM CldlShowers Zoon: CidlShowers 4 PS I: CldlHvy Rain <br /> Temperature: 8:00 AM 62 [Noon: 70 4PM: 6 <br /> PERSONNEL COUNT Spec. Contractor Trade Workforce <br /> Sect. Foreman Journeymen Helpers Total <br /> General <br /> Contractor: D"Agostino 1 Job Supt. <br /> ubcontratctors: <br /> J.J. Enterprises <br /> Riordan Electric project Mgr. 9 <br /> TOTAL <br /> Notes: electrical subcontractor installed a new line on "exposed"temporary electrical panel <br /> for Boston Contract Drilling. <br /> Demolition crew is removing existing steel stair where elevator is going to b a installed. <br /> Writer prepared a speed memo-attached and made part of this report which directed <br /> the Job Supt to secure and male safe all areas of construction site. <br /> job meeting was held from 2:1 Opm to 3:45om off site at the Carol Jacobson Senior <br /> Center. The writer returned to the site directly afterwards and found that the.lob. Supt. <br /> had mobilized the demolition crew and were constructing temporary plywood and <br /> 2x4"framed enclosures to secure openings created in the existing buildings during <br /> the demolition work. <br /> Meavy afternoon rains caused the flooding of the back parking lot and the recessed <br /> floor area of the lower level. The Supt has had a pump placed on the floor level and <br /> is attempting to evacuate the atr from the recess. <br /> meeting rooms area. <br /> Maintenance custodian expressed concern re: the width of door#L19. is door opening <br /> to be wide enough to allow both riding mower and snow blower thru to storage area? <br /> Number Key to inspectionNotes: <br /> 1.Work performed by General Contractor 10.Site meeting participants and discussion <br /> .Work performed by Subcontrators 11.Variations from plans and specs.,instigator,action <br /> .Work items or extra started taken,contrs.seeking compen.+item,labor and <br /> .Work ftems or extras completed materials <br /> 6.Potential or encountered delays 12.Description of job incidents and remarks <br /> .Serious accidents 13. Material and equipment for installation received, <br /> .Visitors and reasons compliance to specs. <br /> .Testing or inspection 14.Work not meeting specifications <br /> .Equipment on site 15. Items in 14 not corrected. <br /> Copies to: Staff Signed. d <br />
The URL can be used to link to this page
Your browser does not support the video tag.