Laserfiche WebLink
Project Representative's Daily Report Page 2 of <br /> Report to. 59 <br /> Date: 9127196 <br /> Architect: strekalovsky&Holt, Inc.- Day: F <br /> Project: Mashpee Town Mall Contractor DAgostino Associates <br /> Superintendent: Len Paoletta <br /> visit to determine staters of temp. sewer line. Sewer line was found intact and <br /> had not been ruptured. Odor world have been caused by recent rain storms <br /> one of which dumped 6"=I- of rain on the area in a 24 hour period of time and <br /> very well may have caused an overflow of the septic pits. <br /> A sewage odor is not discernible on site today. The Joh Supt installed a poly <br /> cover on the east side of attic, south wing, to protect recently installed <br /> insulation and 314'' T&G plywood sub floor. Writer pointed out that a 4"dia. <br /> Cl vent remained open on the west side of ati . <br /> i <br /> Number Key to Inspection Notes, <br /> 1.Work performed by General Contractor 10.Site meeting participants and discussion <br /> .Work performed by Subcontractors 11.Variations from plans and specs.,instigator,action <br /> .Work iters or extra started taken,contrs.seeking compen.,item,labor and <br /> 4.Work items or extra completed materials <br /> .Potential or encountered delays 12. Description of job incidents and remark <br /> .Serious accidents 13.Material and equipment for installation received, <br /> .Visitors and reasons compliance to specs. <br /> .Testing or inspection 14.Work not meeting specifications <br /> g. Equipment on site 15. Items in 14 not corrected. <br /> Copies to: staff Signed: 4", <br />