My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
10/03/1996 TOWN HALL BUILDING COMMITTEE Minutes
>
10/03/1996 TOWN HALL BUILDING COMMITTEE Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/24/2019 5:07:22 PM
Creation date
4/24/2019 1:32:53 PM
Metadata
Fields
Template:
Mashpee_Meeting Documents
Board
TOWN HALL BUILDING COMMITTEE
Meeting Document Type
Minutes
Meeting Date
10/03/1996
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Project Representative's Daily Report Page I of <br /> Report No. 59 <br /> Date: 912719 <br /> Arch itect: strekalovsky& Holt, Inc. Day: F <br /> Project: Mashpee Town Hall Contractor DAgostino Associates <br /> Superintendent: Len Paoletta <br /> Weather: 8:00 All Partly cloudy Boon: Cloudy 4PM4 Cloudy <br /> Temperature: 8:00 All 51 Noon: 58 4PM* 55 <br /> PERSONNEL COUNT Spec. Contractor Trade Workforce <br /> Sect. Foreman Journeymen Hel per Total <br /> General <br /> Contractor: <br /> "Agostino I .lob Supt. 4 5 <br /> Riordan Electric 3 <br /> Millis Plumbing I I <br /> Ironworkers <br /> Subcontractors: <br /> Boston Contract <br /> Masonry 2 <br /> Uf Well Drilling 2 2 <br /> MEM Mechanical <br /> TOTAL <br /> Notes: Note: Asphalt shingles have been installed on plywood roof of temporary <br /> weather proof structure at elect.power panels. In addition, the left hard reverse <br /> door was re-hung and secured. Electricians are working on power and lighting <br /> runs in both the north and south wings. Millis Plumbing is installing rough-in <br /> on first level, south wing. Iron workers are continuing to work on and correct i <br /> plate steel beam and beam to plate connections the GC did mage attempts to <br /> plumb up the structural steal. Corrective welds have not been brushed ars <br /> Painted. Two steel beams were not primed. Boston Contract Drilling is cutting <br /> existing concrete slab, ground floor,south wing for plumbing trench work. <br /> Masons are continuing with prep work in the north wing and steel beam bearing <br /> location at both the east and gest entrance areas. Masonry pockets have been <br /> grouted in solid. Two riggers from A&W Well Drilling have begun drilling for <br /> the new elevator piston. The mechanical subcontractor on site to begin installation <br /> of harmers. The laborer uncovered existing steel beams at the clg of the south <br /> wing lower level. The carpenters are working in both the north and south wings <br /> installing metal stud partitions. Gilmartin plumbing and Heating made a site <br />