My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
10/03/1996 TOWN HALL BUILDING COMMITTEE Minutes
>
10/03/1996 TOWN HALL BUILDING COMMITTEE Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/24/2019 5:07:22 PM
Creation date
4/24/2019 1:32:53 PM
Metadata
Fields
Template:
Mashpee_Meeting Documents
Board
TOWN HALL BUILDING COMMITTEE
Meeting Document Type
Minutes
Meeting Date
10/03/1996
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
.3 <br /> a <br /> Project Representative's Daily Report Page 9 of 1 <br /> Report No. 5i <br /> Date: 9116196 <br /> Architect: StrekaloVsky&Hoit, Inc. Day: M <br /> Project: Mashpee Town Rall Contractor D'Agrostino Associates <br /> Superintendent: Len Paoletta <br /> Weather: 8:00 AM Cloudy Noon: Partly Cloudy 4PM: Pt CidIShwrs <br /> Temperature: :00 AM 60 Noon: 74 4PM: 71 <br /> PERSONNEL COUNT Spec. Contractor Trade Workforce <br /> Sect. Foreman Journeymen Helpers Tot2l <br /> General <br /> Contractor: <br /> D"Agostino t Job Supt. <br /> Masonry <br /> Subcontractors: <br /> Rams Excavating <br /> Riordan Electric 'I2 3 <br /> TOTAL <br /> Notes: Carpenters are installing the remainder of trusses throughout the 1st level overhead. <br /> 3 trusses remain to be installed. Carpenters have strapped the bottom chard of trusses <br /> with 1X stack and are at present using the corridor walls as bearing. <br /> Masons are prepping openings along corridor# -North WIng counter opening at <br /> Treasurer's office. Excavator has backfilled and compacted in 6''lifts, slab areas at <br /> both the east and gest entrances in anticipation of new slab work. The electricians <br /> installed hangers in the north wing. Cable trays have been installed incorridor overhead, <br /> south wing., Ist floor. PVC conduit run stub-ups to chiller pad, north end of site have als <br /> IIID TE: NO Bl TUMA S TIC C A TING HA S BEEN A PPL IED�TO Ro OF TO TEMP. <br /> WEATHERPROOF THERPROOF ENCLOS IRE FOR ELECTRICAL POWER PANELS. STEELIS <br /> NOT ON SITE... TRUCK BROKE E DOW . <br /> Number Key to InspectionNotes: <br /> 1.Work performed by General Contractor 10.Site meeting participants and discussion <br /> .Work performed by Subcontractors 11.Variations from plans and specs.,instigator, action <br /> .Work items or extra started taker,contrs.seeking cornpen.,item,labor and <br /> 4.Work iters or extra completed materials <br /> .Potential or encountered delays 12.Description of job incidents and remarks <br /> .Serious accidents 13.Material and equipment for installation received, <br /> .Visitors and reasons compliance to specs. <br /> .Testing or inspection 14.Work not meeting specifications <br /> J.Equipment on site 15. Items in 14 riotcorrected. <br /> Copies to: Staff Sig <br />
The URL can be used to link to this page
Your browser does not support the video tag.