Laserfiche WebLink
5 <br /> Project Representative's Daily Report Page 1 of <br /> Report N . 5 <br /> Date: 9118196 <br /> Architect: Strekalovslry& Holt, Inc. Day.* 11'IJ <br /> Project: Mashpee Town Hail Contractor "Agro tino Associates <br /> Superintendent: Len Paoletta <br /> Weather. 8:00 AM rainithndr ldy Noon: same PM: same <br /> Temperature: 8:00 AM 57 Noon: 62 4PM: 59 <br /> PERSONNEL COUNT Spec. Contractor Trade Workforce <br /> Sect. Foreman Journeymen Helpers Total <br /> General <br /> Contractor: <br /> 'A ostino I ,lob Supt. 2 . <br /> Masonry � <br /> Subcontractors: <br /> TOTAL 41 <br /> Notes: Mason spent day setting both beam and column bearing plates in anticipation of arrival <br /> of steel. Steel has not yet arrived onob. <br /> Elevator has arrived on site, and is being stored on the north wring. <br /> Carpenters installed insulation between trusses, south wing, and begun installing <br /> 314"tongue and groove plywood sub-door atop new trusses. Protective plastic coating <br /> over rake ofnorth wall, south wing, is being shredded by windy conditions. This was <br /> brought to the attention of the.lob Supt who remarked that he would"fix it." <br /> Again... the south wing roof leaks badly and should be repaired ASAP.. X ll work <br /> being completed thus far in this area will be subject to water damage. <br /> No bitumastic coating has been applied to the plywood roof of the tern. weatherproof <br /> structure at the electrical power panels. This area is saokingr wet. <br /> Number Key to Inspection Notes: <br /> 1.Work performed by General Contractor 10.Site meeting participants and discussion <br /> .Work performed by Subcontractors 11.Variations from plans and specs., instigator,action <br /> .Work items or extra started taken,contrs.seeking compen., item, labor and <br /> .Work items or extra completed materials <br /> . Potential or encountered delays 12.Description of job incidents and remarks <br /> . Serious accidents 13.Material and equipment for installation received, <br /> 7.Visitors and reasons compliance to specs. <br /> 8.Testing or inspection 14.Work not meeting specifications <br /> g.Equipment on site 15. Items in 14 not corrected. <br /> L4.-A.-Copies to: Staff Signed: W4410-� <br />