Project Representative's Daily Report Page I of <br /> Report No. 55 <br /> Date: 9119196 <br /> Arch ite t: strekalovsky& Hoit, Inc. Day: TH <br /> Project: 1ashee Town ball Contractor D"Agostino Assciates <br /> Superintendent: Len Paoletta <br /> Weather: 8:00 AIM Partly sunny Noon: Sunny PM: Sunny <br /> Temperature: 8:00 AM 58 Noon: 70 4PM: 65 <br /> PERSONNEL COUNT Spec. Contractor Trade Workforce <br /> Sect. Foreman Journeymen Helpers Total <br /> General <br /> Contractor; <br /> D'Agostino 1 ,Job Supt. <br /> Masonry , <br /> Iron Workers <br /> Crane operator 7 <br /> Subcontractors: <br /> TOTAL F 121 <br /> Notes: structural steel was delivered and is being erected between the north and south <br /> wings. "dia. PVC sewer line from town office trailers to septic pitjust east of <br /> north wing could be broken. Delivery of steel took place over the temporary <br /> severer lure which is only 2= "=- below grade. The aroma which greets a persons <br /> senses is anything but fragrant. Bldg. Insp. warned Job Supt. that any Bret <br /> insulation and or bldg. rrrateriaWinishes that are or could become wet and moldy <br /> must be kept dry. The Bldg. Insp. was specifically referring to the new insulation <br /> recently installed between the new trusses arra the fact that there are numerous <br /> leaks in the existing roof of the south wing., Ms. Jeanine Delongchamp has been <br /> notified of the above by phone. No biturrras is coating has leen applied to the <br /> roof of the weatherproof structure at the temporary electrical panels. Father the <br /> left hand reverse door has become unhinged from the structure and is being <br /> held in place by 2x stock being propped against the door. <br /> Number fey to Inspection Notes: <br /> 1.Work performed by General Contractor 10.Site meeting participants and discussion <br /> .Work performed by Subcontractors 11.Variations from plans and specs.,instigator,action <br /> .Work items or extra started taken,contrs.seeking cornpen.,item,labor and <br /> .Work items or extra completed materials <br /> . Potential or encountered delays 12. Description of job incidents and remarks <br /> . serious accidents 13.Material and equipment for installation received, <br /> 7.Visitors and reasons compliance to specs. <br /> .Testing or inspection 14.Work not meeting specifications <br /> . Equipment on site 1 . Items in 14 not corrected. <br /> Copies to; Staff Signed: <br />