My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
10/03/1996 TOWN HALL BUILDING COMMITTEE Minutes
>
10/03/1996 TOWN HALL BUILDING COMMITTEE Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/24/2019 5:07:22 PM
Creation date
4/24/2019 1:32:53 PM
Metadata
Fields
Template:
Mashpee_Meeting Documents
Board
TOWN HALL BUILDING COMMITTEE
Meeting Document Type
Minutes
Meeting Date
10/03/1996
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
i <br /> Project Representatives Daily Report Page I of <br /> Report No. 5 <br /> Date: 9123196 <br /> Architect: Strekalovsky&Holt, Inc. Darr; illi <br /> Project: Mashpee Town Hall Contractor D'Agostlrro Associates <br /> Superintendent: Len Paoletta <br /> Weather: :00 AM DloudylL.t. Rain' Noon: Partly Cloudy APM: Cloudy <br /> Temperature: :00 AM 50 Noon: 60 4PM: 55 <br /> PERSONNEL COUNT Spec. Contractor Trade Workforce <br /> force <br /> Sect. Foreman Journeymen Helpers Total <br /> General <br /> Contractor: <br /> D"Agostino 1 Joh Supt. 3 <br /> Apex HVAC <br /> Subcontractors: <br /> TOTAL 61 <br /> Notes: Sheet metal workers began installing duct work in overhead of corridors#2 and 13, <br /> north wing. Carpenters began framing for partition work, south wing-first level <br /> floor. Existing discrepancieslopenings in the existing flooring are being filled and <br /> secured with plywood sub-flooring. <br /> Bitumastic coating has not been applied to the plywood roof of the temporary weatherer <br /> structure at electric power panels. <br /> Number ger Key to InspectionNotes: <br /> 1.Work performed by General Contractor 10- Site meeting participants and discussion <br /> .Work performed by Subcontractors 11.Variations from plans and specs., instigator,action <br /> .Work items or extra started taken,contrs.seeking cornpen., item,labor and <br /> .Work items or extra completed materials <br /> . Potential or encountered delays 12.Description of job incidents and remarks <br /> . Serious accidents 13.Material and equipment for installation received, <br /> 7.Visitors and reasons compliance to specs. <br /> 8.Testing or inspection 14.Work not,meeting specifications <br /> . Equipment on site 1 .Items in 14 not corrected, <br /> Copies to: staff Signed: . <br />
The URL can be used to link to this page
Your browser does not support the video tag.