Laserfiche WebLink
roje t Representative's Daily Report rt Page I of <br /> Report No. 57 <br /> Date: 9124196 <br /> Architect: Strekalovsky&Holt, Inc. Day: T <br /> Project: Mashpee Town Tall Contractor DAgostino Associates <br /> Superintendent: Len Paoletta <br /> Weather; :00 AM Partly cloudy loon: Partly cloudy 4PM: Cloudy <br /> Temperature: 8-00 All 47 Noon: 62 4PM- 59 <br /> PERSONNEL 1 I EL U T Spec. Contractor Trade Workforce <br /> e <br /> Sect. Foreman Journeymen Helpers Total <br /> General <br /> Contractor: <br /> "A ostino I glob Supt. 4 <br /> Iron Workers <br /> Crane operator I t <br /> Subcontractors- <br /> Riordan <br /> ubcontractors:R ordan Electric t <br /> TOTAL 13] <br /> Notes: The electrical subcontractor is workings primarily on lighting runs in the south <br /> wing. The temporary sewer lire from Town Tall-office trailers to septic pit east <br /> side of site is ruptured. triter informed both roger lfoit and Jeanine Delongrehamp <br /> i r i u i_i nini_rrr in_srr. <br /> of condition and fact, that there had been no more than "of corer on PITC line. <br /> #r. Hoit instructed writer to have Gilmarten Heating make repairs to same. <br /> Writer phoned Gilmarten-no answer-so!left a message on answering machine <br /> will follow up. Carpenters are continuing to frame up partitions first level, south <br /> .wing. Iron workers resumed erecting steel between north and south wing. There <br /> is much work to be done on beam to beamlplate connections. Some be ars have <br /> been tack welded on one end and bolted on the other. Bolted connections have <br /> not yet been torqued, and steel is not plumb. Tota Supt. remarked when asked <br /> that he,,personally, was going to shoot tures and plumb the s#eel. No bitumasti <br /> coating has been spread on the temporary rooflweatherproof enclosure at the <br /> electrical power panels. The left hand reverse door,same location,, is still <br /> detached. All parties have been informed of this condition. <br /> Number fey to insp ctionNotes: <br /> 1.Work performed by General Contractor 10.Site meeting participants and discussion <br /> .fork performed by subcontractors 11.Variations from plans and specs., instigator,action <br /> .Work items or extra started taken,contrs.seeking compen., item, labor and <br /> 4.Work items or extra completed materials <br /> . Potential or encountered delays 12. Description of job incidents and remarks <br /> .Serious accidents 13.Material and equipment for installation received, <br /> 7.Visitors and reasons compliance to specs. <br /> .Testing or inspection 14.Work not meeting specifications <br /> . Equipment on site 1 . Items 1n 14 not corrected. <br /> Copies o: Staff Signed: * (I-t- <br />