Project epreenttiers Daily Report Page 1 of <br /> Report N . 66 <br /> Date: 10115196 <br /> Architect: Strekalovsky&plait, Inc. Day: T <br /> Project: Mashpee Town Hall Contractor D'Agostino Associates <br /> Superintendent: Len Paoletta <br /> Weather: 8:00 AM Sunny Noon: Sunny 4PM: sunny Bree y <br /> Ternperarture: 8:00 AIII'1 37 Noon: 54 Pilll: 4 <br /> PERSONNEL COUNT Spec. Contractor Trade Workforce <br /> Sect. Foreman Journeymen Helpers Total <br /> General <br /> Contractor: <br /> D"Agostin o 1 .lob Supt. 2 <br /> Bridgewater Steel <br /> Subcontractors: <br /> M V 2 2 <br /> Riordan Electric <br /> Apex 3 3 <br /> Millis Plumbing 1 1 <br /> Ron's Excavating 2 <br /> TOTAL 201 <br /> Notes: Carpenters are framing up roof area just north of second floor landing, stair#2. <br /> Ironworkers are working on top welded connections of sloped W1 2 X1 6 purlins <br /> over east entrance roof. Connections are being welded and wire brushed. The <br /> 3 upright steel members above these mentionedoins have not yet been fastened <br /> to the horizontal beam, and appear visually to be short. Note: The Bldg. Insp. <br /> has asked the contractor to see the working welders certification without success. <br /> The mechanics are continuing to work on heating suppler and return lures in the <br /> overhead of the north wing. The Apex tinknockers are installing duct work In the <br /> lower level of the south wing. Millis Plumbing is beginning to finish up cast-Iron <br /> rough In throughout and has started his copper rough in. The excavator has <br /> excavated a trench for the domestic water line to the street, and is laying the lure <br /> in the trench just below the recently installed electric duct bank. The electricians <br /> are working on piping,second floor south wing, and on cable trays and rough <br /> in throughout. There is no temporary treat. <br /> Number Key to InspectionNotes: <br /> 1.Work performed by General Contractor 10.Site meeting participants and discussion <br /> .Work perforated by Subcontractors 11.Variations from pians and specs.,instigator,action <br /> 3.Wdrk items or extra started taken,contrs.seeking compen.,item,labor and <br /> .Work items or extra completed materials <br /> . Potential or encountered delays 12.Description of job incidents and remarks <br /> . Serious accidents 13.Materiel and equipment for installation received, <br /> 7.Visitors and reasons compliance to specs. <br /> .Testing or inspection 14.Work not meeting specifications <br /> . Equipment on site 15. Items in 14 not corrected. <br /> • �urL� <br /> Copies to: staff Signed: - <br />