My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
10/30/1996 TOWN HALL BUILDING COMMITTEE Minutes
>
10/30/1996 TOWN HALL BUILDING COMMITTEE Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/24/2019 5:08:28 PM
Creation date
4/24/2019 1:34:08 PM
Metadata
Fields
Template:
Mashpee_Meeting Documents
Board
TOWN HALL BUILDING COMMITTEE
Meeting Document Type
Minutes
Meeting Date
10/30/1996
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
18
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Project Representative's' Daily Report Page 1 of <br /> Report No. 70 <br /> Date: 70/77196 <br /> Architect: Strekalovsky& Hoit, Inc. Day: TFC <br /> Project: Mashpee Town Hall Contractor D"Agostino Associates <br /> Superintendent: Len Paoletta <br /> Heather: 8.00 AM Sunny Noon. Sunny PM: sunny <br /> Temperature, 8:00 AM 59 Noon: 68 4PM: 63 <br /> PERSONNEL COUNT Spec. Contractor Trade -Workforce <br /> Sect. Foreman Journeymen Helpers Total <br /> General <br /> Contractor: <br /> 'Agostino 1 .lob Supt. <br /> Bridgewater steel <br /> Subcontractors: <br /> 11V 2 <br /> Riordan Electric 3 3 <br /> TOTAL 7 <br /> Notes: The mechanics are continuing to work on supply and return heating lines in <br /> addition to drops to fan coil cabinet heaters, north wing. The foreman of this <br /> crew began a layout for the ground floor south wing. The electrical sub-contractor <br /> is continuing with rough in work throughout the facility. carpenters continued <br /> with prep work for anticipated pour of concrete tomorrow. The,Job Supt slid <br /> inform the wryer this afternoon that he was going to make a pour in the main <br /> lobby east entrance, ground floor and 1st level floor. Mr. Paoletta further remarked <br /> that roger Molt had ordered American Engineering and Testing to take 4 cylinders <br /> of tomorrow's pour. Further testing of the recently installed steel is to be taken <br /> by the same firm. The ironworkers are installing the remainder of the galvanized <br /> metal roof deck, and have begun installing the "steel columns along the corridor <br /> ground floor. Note: The metal decking has haat several holes burned thru it as <br /> follows: a) Ist level decor=24 holes;b sloped roof, east entrance =9 holes. Holes <br /> range in size from approx. "dia. to 2"=/-in alfa. As there is no concrete or <br /> roofing applied in these areas yet, the holes are very discernible when looking <br /> up at the underside of decking against a clear blue slay. <br /> Number Key to Inspection Notes: <br /> 1.Work performed by General Contractor 10.Site meeting participants and discussion <br /> .Work performed by Subcontractors 11.Variations from plans and specs., instigator,action <br /> 3.Work items or extra started taken,contrs.seeking compen.,item,labor and <br /> 4.Work items or extra completed mate6ais <br /> . Potential or encountered delays 12.Description of job incidents and remarks <br /> .serious accidents 13.Material and equipment for installation received, <br /> .Visitors and reasons compliance to specs. <br /> .Testing or inspection 14.Work not meeting specifications <br /> .Equipment on site 15.Items in 14 not corrected. <br /> Copies to: Staff Signed: <br />