My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
10/30/1996 TOWN HALL BUILDING COMMITTEE Minutes
>
10/30/1996 TOWN HALL BUILDING COMMITTEE Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/24/2019 5:08:28 PM
Creation date
4/24/2019 1:34:08 PM
Metadata
Fields
Template:
Mashpee_Meeting Documents
Board
TOWN HALL BUILDING COMMITTEE
Meeting Document Type
Minutes
Meeting Date
10/30/1996
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
18
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
i <br /> 1 <br /> Project Representative"s Daily Report Page I o 7 <br /> Report No. 63 <br /> Date: 1017196 <br /> Architect: Str~ekalovsky& Hoit, Inc. Day: M <br /> Project: Ma tepee Town Hall Contractor D'Agostino Associates <br /> Superintendent: Len Paoletta <br /> Weather: 8:00 AM Ptly sunny Loon: Sunny PM: Sunny <br /> Temperature: 8:00 AIM 39 Noon: 63 4PM: 59 <br /> PERSONNEL COUNT Spec. Contractor Trade Workforce <br /> Sect. Foreman Journeymen Helpers Total <br /> General <br /> Contractor: <br /> D'Agostlno I Job Supt. <br /> Subcontractors: <br /> MV Mechanical 1 1 <br /> Apex 2 2 <br /> Bridgewater Steel Fabric. <br /> TOTAL 1 131 <br /> Notes: Visitors; Bill Haght- Bldg. Insp.---Fussell Wheeler-Asst. Bldg. Insp. <br /> Mechanical sub-contractor cont. with the installation of heating supply and return <br /> lines in north wing. Note: all fittings are not on site for this sub-contr, to complete <br /> his work on return litres. Apex cont. with installation of duet work in both the <br /> north and south wings. Iron workers set remainder of galvanized d metal deck in <br /> place. Areas of deck have been cut with a torch. Have not been wire brushed, <br /> clean ed, not have any of the raw edges been touch painted for protection thus far. <br /> Carpenters are working on framing of metal stud partitions and door frames in <br /> north wing. The Bldg. Insp. and his Asst were reviewing this work and are <br /> concerned that as of this date, the "studs which appear to be spanning 18-20 <br /> ' <br /> are not cross brayed. Farther, the top sole track is seared directly into the <br /> underside of the stru tore r of deck. if the area experiences a substantial snow <br /> storm., would the studs buckle ithout any capabilities of expansion at the head? <br /> or would the fasteners on the G B pop and mar the finished wall surface? <br /> Writer remarked that the above rated condition has been reported to the Arch. <br /> and is in the process of being acted upon. Carpenters have secured a clear plastic <br /> tarp along the east side of roof, south wing and have secured this with 1"batten strips <br /> in anticipation of tropical depression Josephine.' <br /> Number Key to Inspection dotes: <br /> 1.Work performed by General Contractor 10.Site meeting participants and discussion <br /> .Work performed by Subcontractors 11.Variations from plans and specs.,instigator,action <br /> .Work items or extra started taken,contr .seeking compen.,item, labor and <br /> .Work items or extra completed materials <br /> .Potential or encountered delays 12.Description of job incidents and remarks <br /> . Serious accidents 13. Material and equipment for installation received, <br /> 7.Visitors and reasons compliance to specs. <br /> .Testing or inspection 14.Work not meeting specifications <br /> .Equipment on site 1 .l#erns in 14 not corrected. <br /> CopiesStaff o. StaSIned. <br /> ZL 1. 4, t4A��� <br />
The URL can be used to link to this page
Your browser does not support the video tag.