My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
10/30/1996 TOWN HALL BUILDING COMMITTEE Minutes
>
10/30/1996 TOWN HALL BUILDING COMMITTEE Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/24/2019 5:08:28 PM
Creation date
4/24/2019 1:34:08 PM
Metadata
Fields
Template:
Mashpee_Meeting Documents
Board
TOWN HALL BUILDING COMMITTEE
Meeting Document Type
Minutes
Meeting Date
10/30/1996
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
18
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Project Representative's Daily Report Page I of <br /> Report No. 64 <br /> Date: 9018196 <br /> Architect: Strekalovsky& Hoi, Inc. Day: T <br /> Project: Mashpee Town!fall Contractor D' g stino Associates <br /> Superintendent: Len Paolea <br /> Weather: 8:00 AM Foglovercast Noon: Overcast 4PM: Overcast1rain <br /> Temperature: 8:00 AM 52 Nom 56 4PM: 5 <br /> PERSONNEL COUNT Spec. Contractor Trade Workforce <br /> Sect. Foreman Journeymen helpers Total <br /> General <br /> Contractor. <br /> D'Agostino 9 .Job Supt. 3 <br /> Subcontractors: <br /> MEV Mechanical 9 7 <br /> Apex 3 <br /> Bridgewater Steel Fabric. <br /> TOTAL 93 <br /> Notes: Ironworkers are continuing to tack well gala, metal decking to steel beams. <br /> Electricians are continuing to work on rough in north wing. Installation of <br /> armored cable, conduit and hardware into recently installed metal studs. Apex <br /> is continuing to work on ductwork lir the south wing 1st le eL MEV is continuing <br /> to work in overhead of north wing, installation of heating suppler and return lines. <br /> Number Key to Inspection Notes: <br /> 1.Work performed by General Contractor 10.site meeting participants and discussion <br /> .Work performed by Subcontractors 11.Variations from plans and sped.,Instigator,action <br /> .Work items or extra started taken,contrs.seeking cornpen.,item,labor and <br /> .Work items or extra completed materials <br /> .Potential or encountered delays 12.Description of job incidents and remarks <br /> .Serious accidents 13.Material and equipment for installation received, <br /> .Visitors and masons compliance to specs. <br /> .Testing or inspection 14.Work not meeting specifications <br /> . Equipment on site 15. hems in 14 not corrected. <br /> Copies t : staff Signed: ( 4,0-� '. <br />
The URL can be used to link to this page
Your browser does not support the video tag.