Laserfiche WebLink
i <br /> 1 <br /> Project Representative's Daily Report Page I of <br /> Report No. 6 <br /> Date: 10110196 <br /> Architect: S rekalo sky&Hoi, Inc. Day: TH <br /> Project: Mashpoe Town Flail Contractor DAgostino Associates <br /> Superintendent: Len Paoletta <br /> Weather: :00 All Cloudy Zoon: Cloudylrain 4PM: Cloud lraln <br /> Temperature: : o A11 53 Noon* 62 4P : 55 <br /> PERSONNEL NNEL C M T Spec. Contractor Trade Workforce <br /> Sect. Foreman Journeymen Helpers Total <br /> General <br /> Contractor: <br /> ' goino 1 .Job Supt. <br /> Subcontractors: <br /> I V lechanlcal <br /> Millis Plumbing <br /> Bridgewater Steel Fabric. <br /> Riordan Electrical <br /> TOTAL 1141 <br /> Notes: carpenters are installing pressed metal door frames and metal studs., ground <br /> floor south wing. The laborer has prepped the recessed lower level, south wing, <br /> and west entrance for what appears to be a pour of cork. tomorrow a.m. When <br /> asked the,Job Supt. did confirm he was going to pour the above noted areas <br /> around -8:90 am. MEV continued work on heating supply and return lines <br /> in the overhead of north wing. Electricians cont. work on rough in throughout <br /> Millis Plumbing is installing carriers and no hub fittings in both the north and <br /> south wings. Ironworkers have installed pour stops at all areas scheduled to <br /> receive concrete slab work. Dote: Writer has confirmed with both Jeanine <br /> Delongcbamp and Job Supt that the Struct. Engr. (Clem lccarey) of Engineers <br /> Design Group visited the site this past Wednesday to make a detailed inspection <br /> of steel erected to date. Mr. Mc Grey will be making a report of the visit. <br /> Number fey to Inspection Notes, <br /> 1.Work performed by General Contractor 10.Site meeting participants and discussion <br /> 2.Work performed by subcontractors 11.Variations from pians and specs.,instigator,action <br /> .Work items or extra started taken,contrs.seeking compen.r item,labor and <br /> 4.Work items or extra completed materials <br /> . Potential or encountered delays 12.Description of job incidents and remark <br /> .Serious accidents 13.Mateftl and equipment for installation received, <br /> 7.Visitors and reasons compliance to specs. � <br /> .Testing or inspection 14.Work not meeting specifications <br /> . Equipment on site 15. Items in 14 not corrected. <br /> Copies o: Staff Signed: • <br />