My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
12/18/1996 TOWN HALL BUILDING COMMITTEE Minutes
>
12/18/1996 TOWN HALL BUILDING COMMITTEE Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/24/2019 5:11:03 PM
Creation date
4/24/2019 1:40:01 PM
Metadata
Fields
Template:
Mashpee_Meeting Documents
Board
TOWN HALL BUILDING COMMITTEE
Meeting Document Type
Minutes
Meeting Date
12/18/1996
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
21
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Representative's <br /> Project F epre en ative's Dail Report Page I of <br /> Report No. 81 <br /> Date: 11126196 <br /> Architect: Strekalovsky&Floit, Inc. Darr: T <br /> Project: Mashpee Town Hall Contractor D"Ag stino Associates <br /> Supedntendent: Leri Paole to <br /> Weather: 8:00 AM Rain Noon: PM: <br /> Temperature: 8:00 AM 54 Noon: PM-. <br /> PERSONNEL COUNT Spec. Contractor Trade Workforce <br /> Sect. Foreman Journeymen Helper Total <br /> General <br /> Contractor: <br /> ' go tirro I .Job Supt. <br /> Subcontractors: <br /> Paint <br /> Sprinkler 1 9 <br /> Elevator 2 2 <br /> Steel workers 3 3 <br /> Concrete workers <br /> Fire Protection 3 3 <br /> Electrical 2 2 <br /> Plasterers 3 3 <br /> Masonry <br /> TOTAL 311 <br /> Notes: Plastering and taping ofjoints being done first level. Concrete being delivered for <br /> Stair#2. Iron workers removing section of joist where new stairs will be going down <br /> to storage area. Steel studs being installed at same location. Workers installing <br /> sleet rock in main meeting area. Railing installed around stairs. Demo of existing <br /> wall on lower level. Sprinkler pipe being installed on lower level Masons installing <br /> conc. block in vault. <br /> Number Key to InspectionNotes: <br /> 1.Work performed by General Contractor 10.Site meeting participants and discussion <br /> .Work performed by Subcontractors 11.Variations from puns and specs.,'instigator,action <br /> .Work items or extra started taken,contrs.seeking compen.*item,labor and <br /> 4.Work items or extra completed materials <br /> 5.Potential or encountered delays 12.Description of job incidents and remarks <br /> .Sedous accidents 13.Material and equipment for installation received, <br /> 7.Visitors and reasons compliance to sped. <br /> 8.Testing or inspection 14.Work not meeting specifications <br /> . Equipment on site 15.Items its 14 not corrected. <br /> Copies to: Staff Signed: <br />
The URL can be used to link to this page
Your browser does not support the video tag.