My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
12/18/1996 TOWN HALL BUILDING COMMITTEE Minutes
>
12/18/1996 TOWN HALL BUILDING COMMITTEE Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/24/2019 5:11:03 PM
Creation date
4/24/2019 1:40:01 PM
Metadata
Fields
Template:
Mashpee_Meeting Documents
Board
TOWN HALL BUILDING COMMITTEE
Meeting Document Type
Minutes
Meeting Date
12/18/1996
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
21
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
k Q <br /> Project Representative's Daily Report Page I o <br /> Report No. 80 <br /> Date: 11122196 <br /> Architect: Strekalovsky&Holt, Inc. Darr: P <br /> Project: Mashpee Town Hall Contractor 'Agostino Associates <br /> Superintendent: Len Paoletta <br /> Weather: :00 AM Noon: Sunny PIIS: <br /> Temperature: 8:00 AM Noon: 42 4PM: <br /> PERSONNEL COUNT spec. Contractor Trade Workforce <br /> Sect. Foreman Journeymen Helpers Total <br /> General <br /> Contractor: <br /> *Agostino I glob Supt. <br /> 0 <br /> Subcontractors: <br /> Plumbing <br /> Masons <br /> Electrician 2 <br /> Fire Protection 2 <br /> Windows <br /> TOTAL 191 <br /> Notes: More unit vents have been installed on 1st level. Plasterer working on Ist floor. <br /> Windows being installed at landing between Ist and upper level. Windows installed <br /> at elevator lobby on upper level. Sheet rock being installed on 1st floor. Masonry <br /> at front entrance being put up around columns. Piping being wrapped with insulation <br /> on lower level. Pressure treated wood and insulation installed between window on <br /> 1st floor levels, No alum. cover over P.T. wood. Two areas were brought to Mr. <br /> Paoletta"s attention on front windows. Mr. Paoletta talked to window installer and <br /> they will fix areas. one window housing seemed to be slightly bent and one window <br /> had excess caulking which needs to be removed from surface. <br /> Number Key to Inspection cotes: <br /> 1.Work performed by General Contractor 10.site meeting participants and discussion <br /> .Work performed by Subcontractors 11.Variations from plans and specs.,instigator,action <br /> .Work items or extra started taken,contrs.seeking compen.,item, labor and <br /> .Work items or extra completed materials <br /> .Potential or encountered delays 12.Description of job incidents and remarks <br /> .Serious accidents 13.Material and equipment for installation received, <br /> 7.Visitors and reasons compliance to spew. <br /> .Testing or inspection 14.Work not meeting specifications <br /> . Equipment on site 15. Items in 14 not corrected. <br /> Copies to: Staff Signed: <br />
The URL can be used to link to this page
Your browser does not support the video tag.