Laserfiche WebLink
Oroject <br /> epre lnt hive's Daily Report Page I o <br /> Report No. 79 <br /> Date: 11121196 <br /> Architect: S rekalo sky&Hoit, Inc. Day: TH <br /> Project: Mashpee Town !fall Contractor DAgostino Associates <br /> Superintendent: Leri Pole# a <br /> Weather: 8:00 AM Noon& Ptly sunny PM: <br /> Temperature: 8:00 AIM goon: 42 P1: <br /> PERSONNEL COUNT Spec. Contractor Trade Workforce <br /> Sect. Foreman Journeymen Helpers Total <br /> General <br /> Contractor: <br /> "A rostino 1 .lob Supt. 6 <br /> 0 <br /> Su bcntror : <br /> Iron Workers 2 <br /> Electrician 2 2 <br /> Plumbers <br /> Fire Protection 2 1 3 <br /> Window 3 <br /> TOTAL 181 <br /> Notes: Steel treads and stringers being installed going from 1st level to upper level. Sheet <br /> rock being installed in machine room. Face brick being put around front entrance <br /> and around columns at front entrance. Sprinkler pipe being installed on lower and <br /> first levels. Windows being installed in remaining opening on lower hire! <br /> Number Key to InspectionNotes: <br /> 1.Nark performed by General Contractor 10.Site meeting participants and discussion <br /> .Work performed by Subcontractors 11.Variations from plans and specs., instigator,action <br /> 3.Work items or extras started taken,contrs.seeking compen.,item,labor and <br /> .Work items or extra completed materials <br /> .Potential or encountered delays 12. Description of job incidents and remarks <br /> j B.Serious accidents 13.Material and equipment for installation received, <br /> 7.Visitors and reasons compliance to specs. <br /> .Testing or inspection 14.Work not meeting speciecation <br /> . Equipment on site 15. Items in 14 not corrected. <br /> Copies too Staff Signed: <br />