My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
12/18/1996 TOWN HALL BUILDING COMMITTEE Minutes
>
12/18/1996 TOWN HALL BUILDING COMMITTEE Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/24/2019 5:11:03 PM
Creation date
4/24/2019 1:40:01 PM
Metadata
Fields
Template:
Mashpee_Meeting Documents
Board
TOWN HALL BUILDING COMMITTEE
Meeting Document Type
Minutes
Meeting Date
12/18/1996
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
21
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Project Representative's Daily Report Page 1 of I <br /> Report No. 78 <br /> Date: 11120196 <br /> Architect: Strekalovsky& Hoi, Inc. Darr: W <br /> Project: Mashpee Town Hall Contractor D"Agostino Associates <br /> Superintendent: Len Paoletta <br /> Weather. 8:00 AM sunny [boon: Sunny Pi t; Ptly sunny <br /> Temperature. .00 AM 42 Doan. 48 4PM: 45 <br /> PERSONNEL COUNT Spec. Contractor Trade Workforce <br /> e <br /> Sect. Foreman Journeymen Helpers Total <br /> General <br /> Contractor: <br /> 'Agostino 1 lob Supt. <br /> Windows <br /> Subcontractors: <br /> Insulators <br /> Fire Protection <br /> Plumbers <br /> Electricians <br /> Iron Markers 2 <br /> Masons <br /> TOTAL <br /> Notes: Windows at lower level installed on front of building. Wood blockings, frames and <br /> windows being installed on lower lege/on rear of building. Masons putting up face <br /> brick around block base at rear main entrance. Insulator putting insulation around <br /> piping on lager level. HVAC unit lifted into position in Mech rooms on lower level <br /> Iron workers putting up steel stringers and channels at landings for upper landing <br /> at stair#2 leading to attic area on upper level. Weekly site meeting took place at <br /> p.m. followed up with a walk through. Meeting and walk through concluded <br /> at 2:30 p.m. <br /> Number Key to InspectionNotes* <br /> 1.Work performed by General Contractor 10.Site meeting participants and discussion <br /> .Work performed by Subcontractors 11.Variations from pians and specs.,instigator,action <br /> .Work items or extra started taken,contr .seeking cornpen.,item,labor and <br /> .Work items or extra completed matedals <br /> .Potential or encountered delays 12.Description of job incidents and remarks <br /> .Serous accidents 13.Material and equipment for installation received, <br /> 7.Visitor's and reasons compliance to specs. <br /> .Testing or inspection 14.Work not meeting specifications <br /> g.Equtprnent on site IS.Items in 14 not corrected. <br /> Copies to: staff Signed: <br />
The URL can be used to link to this page
Your browser does not support the video tag.