My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
12/18/1996 TOWN HALL BUILDING COMMITTEE Minutes
>
12/18/1996 TOWN HALL BUILDING COMMITTEE Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/24/2019 5:11:03 PM
Creation date
4/24/2019 1:40:01 PM
Metadata
Fields
Template:
Mashpee_Meeting Documents
Board
TOWN HALL BUILDING COMMITTEE
Meeting Document Type
Minutes
Meeting Date
12/18/1996
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
21
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Project Representative's Daily Report Page 1 of <br /> Report No. 76 <br /> Date: 11118196 <br /> Architect; Stre aloe sky&Holt, Inc. Day: M <br /> Project: Mashpee Town Hall Contractor_D"Agostino Associates <br /> Superin#endeft Leri Paoletta <br /> Weather: 8:00 AM Sunny Noon: 4PM: <br /> Temperature: 8:00 AM 54 Boon: 4PM: <br /> PERSONNEL COUNT Spec. Contractor Trade Workforce <br /> Sect. Foreman Journeymen Helpers Total <br /> General <br /> Contractor: <br /> 'A ostino 1 Jab Supt. <br /> HVAC 2 2 <br /> Subcontractors: <br /> Electricians 3 3 <br /> Plumbing 1 1 <br /> Fire Protection 3 3 <br /> Structural Steel 2 <br /> Krin low <br /> Masons 3 3 <br /> TOTAL 2 <br /> .51 <br /> Notes: Temp. meat running at 64 on 1st floor, cooler on lower levels. Masons continuing, <br /> to put face,bride over rear entry. Forms being removed from the new retaining,wall <br /> at the 1st of the 2 new planters. At rear of building windows and frames are being, <br /> Installed. At front of buildings sheet rock is being,installed on Ist floor. HVAC <br /> insulation is being installed on lower level Holes are being drilled for rebar and <br /> conc. block being installed. <br /> i <br /> Number Key to Inspection Notes: <br /> 1.Work performed by General Contractor 10.Site meeting participants and discussion <br /> .Work performed by Subcontractors 11.Va dations from plans and specs.,instigator,action <br /> .Work items or extra started taken,contra.seeking compen.,item,labor and <br /> .Work items or extra completed materials <br /> S.Potential or encountered delays 12.Description of job incidents and remarks <br /> .Serious accidents 13.Material and equipment for installation received, <br /> 7.Visitors and reasons compliance to specs. <br /> .Testing or inspection 14.Work not meeting specifications <br /> .Equipment on site 15. Items in 14 not corrected. <br /> Copies to: Staff Signed: <br />
The URL can be used to link to this page
Your browser does not support the video tag.